Description City State Jobs Cost Program Type Vote Ratio
Construct Tradewinds Parkway easterly to intersect with Agricultural Drive Madison WI 5 $950,000 Streets/Roads 102
Expansion of Jackson National Life Insurance Headquarters Lansing MI 800 $2,000,000 CDBG -234
East Boston Stadium improvements Boston MA 48 $6,000,000 CDBG -142
Commuter Ferry Purchase Lynn MA 10 $250,000 Water 1
Grove Street #2 Solar Array Project Brockton MA 20 $5,000,000 Energy -4
Arterial Streets: North Beach Street ($6.0M); W. Rosedale Retrofit ($4.0M); Silver Creek ($2.0M); Precinct Line ($10.0M); Summer Creek ($3.0M); Berry Street / 287 ($1.5M); Harley Street Drainage & Realignment ($45.0M); and Keller Hicks ($4.0). Fort Worth TX 944 $75,500,000 Streets/Roads 60
Camillus House Building Improvements Miami FL 200 $10,000,000 CDBG -3
Community Archives and Record Center (CARC) Improvements Grand Rapids MI 80 $5,441,400 CDBG -35
Sodium Hypochlorite Storage and Feed Facility - drinking water purification New Orleans LA 18 $3,300,000 Water 5
Route 82 Bypass - To construct the Route 82 Bypass in Greenville, MS Greenville MS 1904 $80,000,000 Streets/Roads 20
Orlando Amtrak/Commuter Rail Transfer Station Renovation-1400 Sligh Blvd-Orlando, FL 32806 Orlando FL 15 $3,500,000 Amtrak 38
Traffic Sign Replacement Throughout the City Hampton VA 6 $300,000 Streets/Roads -32
Deer Valley Airport - Runway Safety Areas Improvements. Phoenix AZ 0 $9,251,990 Airport -2
Back River Dredging/Factory Point Restoration Hampton VA 100 $5,000,000 Water 23
1. NE 36th St. Bridge: Construction of a bridge over SR 520, including one through lane in each direction, turn lanes, bike lanes, sidewalks and intersection improvements on each end. The bridge reduces the distance to cross SR 520 from two miles to .2 Redmond WA 198 $14,500,000 Streets/Roads -27
The proposed project is to construct a restroom facility in the Heart of Downtown Hopkinsville that will service the many amenities that are currently available. The proposed facility would be erected in close proximity to outdoor facilities Hopkinsville KY 0 $200,000 CDBG -9
EMA unit startup costs Whiting IN 2 $75,000 Public Safety -3
The proposed project includes the establishment of the Campbell Street corridor to provide a more efficient entrance into downtown Hopkinsville. The proposal is seeking funding for the renovation of Campbell Street. Hopkinsville KY 20 $15,000,000 CDBG 29
Dry Dam: The proposed project will include the design and construction of a regional flood control facility and/or watershed lakes strategically placed to provide the necessary flood control for the South Fork of Little River. Flooding in the City of Hopk Hopkinsville KY 75 $13,000,000 Water 63
100 Hybrid vehicles for City Fleet. Kalamazoo MI 1000 $3,000,000 Energy -131
Trolley Track Trail - Connect Indian Creek Greenway Trail to Trolley Track Trail Kansas City MO 28 $2,400,000 CDBG 0
Ridgeview Drive from Stacy Road to US 75-This 7000 foot project includes 4 new lanes of regional divided arterial. Allen TX 44 $8,700,000 Streets/Roads -136
Family Resource Coordinator Program Kileen TX 1 $45,000 Public Safety -24
Downtown Wayfinding Signage and Visitors Amenity Plan Baton Rouge LA 16 $2,000,000 CDBG -21
Fully staff Regional Airport Kileen TX 7 $423,839 Public Safety -11
School zone crossing flashers that are LED and solar powered (160 crossings) Baton Rouge LA 5 $1,300,000 Energy -30
Fully staff PD Headquarters Kileen TX 44 $5,992,660 Public Safety 9
Construct new Downtown Intermodal Transit Shelter Baton Rouge LA 10 $1,000,000 Transit -29