| Construct Tradewinds Parkway easterly to intersect with Agricultural Drive |
Madison |
WI |
5 |
$950,000 |
Streets/Roads |
102 |
| Expansion of Jackson National Life Insurance Headquarters |
Lansing |
MI |
800 |
$2,000,000 |
CDBG |
-234 |
| East Boston Stadium improvements |
Boston |
MA |
48 |
$6,000,000 |
CDBG |
-142 |
| Commuter Ferry Purchase |
Lynn |
MA |
10 |
$250,000 |
Water |
1 |
| Grove Street #2 Solar Array Project |
Brockton |
MA |
20 |
$5,000,000 |
Energy |
-4 |
| Arterial Streets:
North Beach Street ($6.0M); W. Rosedale Retrofit ($4.0M); Silver Creek ($2.0M); Precinct Line ($10.0M); Summer Creek ($3.0M); Berry Street / 287 ($1.5M); Harley Street Drainage & Realignment ($45.0M); and Keller Hicks ($4.0). |
Fort Worth |
TX |
944 |
$75,500,000 |
Streets/Roads |
60 |
| Camillus House Building Improvements |
Miami |
FL |
200 |
$10,000,000 |
CDBG |
-3 |
| Community Archives and Record Center (CARC) Improvements |
Grand Rapids |
MI |
80 |
$5,441,400 |
CDBG |
-35 |
| Sodium Hypochlorite Storage and Feed Facility - drinking water purification |
New Orleans |
LA |
18 |
$3,300,000 |
Water |
5 |
| Route 82 Bypass - To construct the Route 82 Bypass in Greenville, MS |
Greenville |
MS |
1904 |
$80,000,000 |
Streets/Roads |
20 |
| Orlando Amtrak/Commuter Rail Transfer Station Renovation-1400 Sligh Blvd-Orlando, FL 32806 |
Orlando |
FL |
15 |
$3,500,000 |
Amtrak |
38 |
| Traffic Sign Replacement Throughout the City |
Hampton |
VA |
6 |
$300,000 |
Streets/Roads |
-32 |
| Deer Valley Airport - Runway Safety Areas Improvements. |
Phoenix |
AZ |
0 |
$9,251,990 |
Airport |
-2 |
| Back River Dredging/Factory Point Restoration |
Hampton |
VA |
100 |
$5,000,000 |
Water |
23 |
| 1. NE 36th St. Bridge: Construction of a bridge over SR 520, including one through lane in each direction, turn lanes, bike lanes, sidewalks and intersection improvements on each end. The bridge reduces the distance to cross SR 520 from two miles to .2 |
Redmond |
WA |
198 |
$14,500,000 |
Streets/Roads |
-27 |
| The proposed project is to construct a restroom facility in the Heart of Downtown Hopkinsville that will service the many amenities that are currently available. The proposed facility would be erected in close proximity to outdoor facilities |
Hopkinsville |
KY |
0 |
$200,000 |
CDBG |
-9 |
| EMA unit startup costs |
Whiting |
IN |
2 |
$75,000 |
Public Safety |
-3 |
| The proposed project includes the establishment of the Campbell Street corridor to provide a more efficient entrance into downtown Hopkinsville. The proposal is seeking funding for the renovation of Campbell Street. |
Hopkinsville |
KY |
20 |
$15,000,000 |
CDBG |
29 |
| Dry Dam: The proposed project will include the design and construction of a regional flood control facility and/or watershed lakes strategically placed to provide the necessary flood control for the South Fork of Little River. Flooding in the City of Hopk |
Hopkinsville |
KY |
75 |
$13,000,000 |
Water |
63 |
| 100 Hybrid vehicles for City Fleet. |
Kalamazoo |
MI |
1000 |
$3,000,000 |
Energy |
-131 |
| Trolley Track Trail - Connect Indian Creek Greenway Trail to Trolley Track Trail |
Kansas City |
MO |
28 |
$2,400,000 |
CDBG |
0 |
| Ridgeview Drive from Stacy Road to US 75-This 7000 foot project includes 4 new lanes of regional divided arterial. |
Allen |
TX |
44 |
$8,700,000 |
Streets/Roads |
-136 |
| Family Resource Coordinator Program |
Kileen |
TX |
1 |
$45,000 |
Public Safety |
-24 |
| Downtown Wayfinding Signage and Visitors Amenity Plan |
Baton Rouge |
LA |
16 |
$2,000,000 |
CDBG |
-21 |
| Fully staff Regional Airport |
Kileen |
TX |
7 |
$423,839 |
Public Safety |
-11 |
| School zone crossing flashers that are LED and solar powered (160 crossings) |
Baton Rouge |
LA |
5 |
$1,300,000 |
Energy |
-30 |
| Fully staff PD Headquarters |
Kileen |
TX |
44 |
$5,992,660 |
Public Safety |
9 |
| Construct new Downtown Intermodal Transit Shelter |
Baton Rouge |
LA |
10 |
$1,000,000 |
Transit |
-29 |