WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

Jerry Brito talks about the new Stimulus Watch site on WUSA... 11/18/2009

Jerry Brito talks about the new Stimulus Watch site on WUSA Channel 9 News.

Help Washington Watch track congressional earmarks 07/23/2009

Stimulus Watch was inspired in part by Washington Watch, a site that lets you find, rate, describe, and discuss legislation…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Cerritos, California

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Cerritos is $106,899,400

Description City State Jobs Cost Program Type Vote Ratio
Project No. 73015 This project will provide for replacing an obsolete 2-lane (1 lane each direction) bridge with a 4-lane bridge over Coyote creek along Del Amo Boulevard which is a major thoroughfare connecting Los Angeles and Orange Counties. Cerritos CA 60 $17,000,000 Streets/Roads -9
Project No. 13101 Del Amo Boulevard Pavement Rehabilitation: This project will resurface the roadway on the westbound side of Del Amo Boulevard between Denni Street and the San Gabriel River. Cerritos CA 20 $1,800,000 Streets/Roads -9
Project No. 13012 Marquardt Avenue Pavement Rehabilitation: This project will resurface Marquardt Avenue between Alondra Boulevard and Artesia Boulevard and includes the construction of landscaped medians. Cerritos CA 20 $1,529,400 Streets/Roads -10
Project No. 14088 Residential Street Pavement Rehabilitation This is an ongoing project to rehabilitate residential streets throughout the City based upon data obtained from the CityÂ’s Pavement Management System. Cerritos CA 20 $1,200,000 Streets/Roads -7
Project No. 13068 Equitable/Struikman/Bettencourt Pavement Rehabilitation: This project will resurface Equitable Road, Struikman Road and Bettencourt Street between Marquardt Avenue and Edwards Road. Cerritos CA 20 $950,000 Streets/Roads -7
Project No. 14005 Artesia Boulevard Pavement Rehabilitation: This project will resurface the roadway on Artesia Boulevard between Carmenita Road and Valley View Avenue. The scope of the project includes replacement of all necessary access ramps. Cerritos CA 20 $890,000 Streets/Roads -6
Project No. 13011 Valley View Boulevard Pavement Rehabilitation: This project will resurface the southbound side of Valley View Boulevard between the northerly Cerritos City limits and Artesia Boulevard. Cerritos CA 20 $710,000 Streets/Roads -6
Project No. 13102 Keller/Fabrica/Bolsa Streets Pavement Rehabilitation: This project will resurface the roadway on Keller Circle, Fabrica Way and Bolsa Lane between Artesia Boulevard and 183rd Street. Cerritos CA 20 $700,000 Streets/Roads -5
Project No. 13032 Studebaker Road Pavement Rehabilitation: This project will resurface Studebaker Road between South Street and Del Amo Boulevard. The scope of the project includes replacement of all necessary access ramps. Cerritos CA 20 $600,000 Streets/Roads -7
Replacement of Concrete Intersections: This project will provide for replacing pavement sections at two intersections within the Cerritos Towne Center area. The deteriorating concrete pavements at the intersections of Shoemaker Street and Artesia Boule Cerritos CA 20 $600,000 Streets/Roads -5
Project No. 15100 Traffic Signal Coordination: This project will provide traffic signal synchronization to approximately 50 traffic signals located on arterial streets citywide. Cerritos CA 4 $560,000 Streets/Roads -9
Project No. 14031 South Street Pavement Rehabilitation and Construction of Landscaped Medians: This project will resurface the roadway on South Street Pioneer Boulevard and Ely Avenue and includes the construction of landscaped medians. Cerritos CA 14 $470,000 Streets/Roads -7
Project No. 13016 Marquardt Bridge Repair/Paint This project includes maintenance and repair of the Marquardt Bridge at the Coyote Creek Flood Control Channel. Cerritos CA 10 $290,000 Streets/Roads -6
Project No. 13086 Access Ramps: This project provides the resources to upgrade access ramps at various locations citywide to comply with ADA guidelines. Cerritos CA 10 $230,000 Streets/Roads -5
Project No. 14077 Arterial Street Slurry Seal: This project will provide an application of slurry seal to various arterial highways in Cerritos as part of an ongoing maintenance project. Cerritos CA 12 $230,000 Streets/Roads -7
Project No. 13104 College Place Pavement Rehabilitation: This project will resurface the roadway on College Place west of Studebaker Road. The scope of the project includes replacement of all necessary access ramps. Cerritos CA 20 $230,000 Streets/Roads -3
Project No. 13032 Studebaker Road Construction of Landscaped Median: This project provides for the construction of a landscaped median on Studebaker Road south of South Street. The project should be completed in conjunction with the Studebaker Road Pa Cerritos CA 14 $180,000 Streets/Roads -8
Project No. 13105 Berwyn Road Pavement Rehabilitation: This project will resurface the roadway on Berwyn Road west of Valley View Avenue. The scope of the project includes replacement of all necessary access ramps. Cerritos CA 20 $180,000 Streets/Roads -6
Project No. 17100 Water Valve Replacement Project: This project will replace the water valves for the potable water system main lines at various locations citywide. Cerritos CA 10 $400,000 Water -1
Project No. 17028 Bettencourt Reclaimed Waterline replacement: This project will replace the reclaimed waterline between Bettencourt and Rainbow parks. Cerritos CA 10 $340,000 Water -5
In accordance with and required under California Redevelopment Law, the City of Cerritos has approved Cuesta Villas, a 247-unit affordable senior housing development, which includes a 13,000-square-foot neighborhood senior recreation center and a 4-acre p Cerritos CA 400 $65,950,000 CDBG -67
Expansion of Cerritos Library: addition of 3,000 square feet and incorporation of energy-efficient lighting solutions Cerritos CA 150 $4,200,000 Energy -32
Replacement of City HVAC System: replacement of 30-year-old heating/ventilation/air conditioning system at Cerritos Civic Center to increase energy efficiency and convenience for the public Cerritos CA 30 $3,000,000 Energy -3
Replacement of Auto Square Signage: upgrade of existing Cerritos Auto Square full-color display signage with LED technology; estimated 60% reduction in energy usage Cerritos CA 4 $500,000 Energy -23
Swim Center Environmental Control System: replacement of 25-year-old boiler with high-efficiency environmental control system, to reduce energy usage by approximately 70% Cerritos CA 8 $500,000 Energy 2
"Go Green" Supplemental Power System for Cerritos Library: installation of micro-turbine generators in accordance with California state requirements, to prevent blackouts and reduce adverse environmental impacts Cerritos CA 5 $360,000 Energy 39
Cerritos Center for the Performing Arts Audio System: Conversion of audio system from analog to digital technology to achieve a minimum 40% increase in energy efficiency Cerritos CA 4 $250,000 Energy -23
Replacement of Library Computers: replacement of 150 desktop computers to reduce energy consumption and provide more efficient service to Library patrons, for research and job training purposes Cerritos CA 6 $250,000 Energy -22
Video Monitoring/Public Safety -- Cerritos Park Sites: installation of up to 200 security cameras at various park sites within Cerritos Cerritos CA 6 $2,800,000 Public Safety -5