WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

Jerry Brito talks about the new Stimulus Watch site on WUSA... 11/18/2009

Jerry Brito talks about the new Stimulus Watch site on WUSA Channel 9 News.

Help Washington Watch track congressional earmarks 07/23/2009

Stimulus Watch was inspired in part by Washington Watch, a site that lets you find, rate, describe, and discuss legislation…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Channahon, Illinois

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Channahon is $7,382,000

Description City State Jobs Cost Program Type Vote Ratio
Reconstruction and widening of 1/2 mile of class 2 truck route on Dellos Road with rehabilitation of 100 year old bridge Channahon IL 95 $1,575,000 CDBG 2
new water tower for the industrial area east of I55 Channahon IL 85 $1,540,000 CDBG -11
1 mile of 12" ductile iron water main connecting the main line to a dead end line to form a loop on Dove drive Channahon IL 55 $780,000 CDBG 3
1 mile of road to be reconstructed, widened to accomodate growing traffic between two towns. Also, we need to add shoulders and ditches, replacing culverts Ready to go in Spring 2010 Channahon IL 55 $675,000 CDBG 4
3/4 mile of 12" ductile iron water main connecting two dead end water mains from Old Kerry Grove Road to Ridge Road Channahon IL 35 $579,000 CDBG 2
3/4 mile of Full Depth Reclamation of existing road and stabilization with asphalt overlay in Highlands subdivision with curb, sidewalk and storm sewer repair ready to go in Spring 2009 Channahon IL 51 $560,000 CDBG -2
3/4 mile of reconstruction on Blackberry Dr which is the only access point for the education center and public works garage phase 1&2 engineering Spring 09 and construct Fall 09 to Spring 2010 Channahon IL 55 $489,000 CDBG -1
Interconnecting 1 mile of bikepath/ safe passage from west side of town to east side of town and park district/shopping area located along Bridge Street ready to build in fall 2009 Channahon IL 57 $299,000 CDBG -13
1/2 mile of Full Depth Reclamation of existing roadway and stabilization with asphalt overlay on Hansel Road design complete awaiting spring 2009 construction Channahon IL 31 $250,000 CDBG 0
sanitary sewer rehabilitation to correct inflow/infiltration throughout the system up to 400 manholes Channahon IL 10 $200,000 CDBG 0
1/3 mile of 3" asphalt structural overlay on Tabler Road as it is being used as a truck route along with shoulder improvements and striping ready to go in Spring 2009 Channahon IL 20 $180,000 CDBG -1
1/2 mile of 2" asphalt overlay on Ridge Road with shoulder and striping replacement ready to go Spring of 2009 Channahon IL 15 $155,000 CDBG 6
sidewalk addition and replacement to connect existing bikepath along Rt 6 to existing I&M Canal parks/walks Ready Spring 2009 Channahon IL 18 $100,000 CDBG -10