WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

Jerry Brito talks about the new Stimulus Watch site on WUSA... 11/18/2009

Jerry Brito talks about the new Stimulus Watch site on WUSA Channel 9 News.

Help Washington Watch track congressional earmarks 07/23/2009

Stimulus Watch was inspired in part by Washington Watch, a site that lets you find, rate, describe, and discuss legislation…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Citrus Heights, California

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Citrus Heights is $46,330,000

Description City State Jobs Cost Program Type Vote Ratio
Auburn Blvd. Enhancement/Reconstruction/Rehabillatation. Underground all overhead utilities for safety; widen roadway to include bicycle lanes; eliminate left turn lanes and construct medians for pedestran and vehicle safety; construct new vertical curb Citrus Heights CA 250 $22,000,000 Streets/Roads -11
Carbon Footprint Reduction. Retrofit, construct lighting facilities to allow for installation and use of solar panels to generate energy for Civic Complex and adjacent street lights. Citrus Heights CA 35 $9,000,000 Streets/Roads -30
Sidewalk and ADA Improvemtns. Reconstruct sidewalks with trip hazards, install new ADA compliant ramps to improve pedestrain safety; reconstruct rolled curbing along arterials, convert to vertical curbing to improve pedestrain safety and walkability Citrus Heights CA 40 $7,000,000 Streets/Roads -7
Pedestrian Safety Project - Greenback Lane from Mariposa West to west of Birdcage. Reconstruct center medians for pedestrainand vehicle safety; install safety barriers to eliminate illegal foot traffic across Greenback Lane Citrus Heights CA 20 $1,500,000 Streets/Roads -6
Sunrise Blvd. Pedestrian Safety. Infill sidewalk along SUnrise Blvd. to increase pedestrian safety and promote walkability and ADA compliance Citrus Heights CA 16 $1,180,000 Streets/Roads -1
Carbon Footprint Reduction Program - Safety Lights. Replace Mercury Vapor street lighting- replace with induction lighting along major arterials Citrus Heights CA 4 $1,000,000 Streets/Roads -17
Lauppe Lane Drainage reconstruction and replace existing in-situ lining of existing detoriated corrugated pipe to prevent flooding Citrus Heights CA 15 $1,000,000 Streets/Roads 2
Old Auburn Road Reconstruction and rehabilitation Citrus Heights CA 16 $910,000 Streets/Roads -2
Old Auburn Road reconstruction and rehabilitation and construct Class I Bikeway along Old Auburn Road, between Fair Oaks and Wachtel Citrus Heights CA 16 $900,000 Streets/Roads 7
Road reconstruction and rehabilitation Citrus Heights CA 13 $780,000 Streets/Roads 4
Twin Oaks Ave Reconstruction and rehabilitation; between Twin Oaks Ave. and SUnrise Blvd. Citrus Heights CA 4 $570,000 Streets/Roads -2
Pavement reconstruction and rehabilitaion on Fair Oaks Blvd. from OakAvenue to Old Auburn Road Citrus Heights CA 4 $490,000 Streets/Roads -2