| Margaret McDermott (IH-30) Bridge Reconstruction |
Dallas |
TX |
2465 |
$246,540,000 |
Streets/Roads |
-98 |
| Upgrade communication system for centralized traffic control system |
Dallas |
TX |
330 |
$33,000,000 |
Streets/Roads |
22 |
| Streetlights on freeways without existing lighting |
Dallas |
TX |
250 |
$24,398,000 |
Streets/Roads |
30 |
| Pedestrian Bridge over UP Railroad at Cadiz Street |
Dallas |
TX |
200 |
$20,000,000 |
Streets/Roads |
-91 |
| Sylvan Avenue bridge reconstruction |
Dallas |
TX |
197 |
$19,700,000 |
Streets/Roads |
3 |
| Linfield Road Pedestrian Bridge |
Dallas |
TX |
100 |
$10,000,000 |
Streets/Roads |
-39 |
| Chalk Hill Road Reconstruction |
Dallas |
TX |
90 |
$9,100,000 |
Streets/Roads |
-8 |
| Battery Back up for traffic signals city-wide |
Dallas |
TX |
90 |
$9,000,000 |
Streets/Roads |
8 |
| Replace structurally deficient traffic signal poles |
Dallas |
TX |
90 |
$8,800,000 |
Streets/Roads |
-2 |
| Sign replacement program - regulatory and warning. 100,000 signs city-wide. |
Dallas |
TX |
83 |
$8,250,000 |
Streets/Roads |
-75 |
| Industrial Boulevard reconstruction from Continental Avenue to RR |
Dallas |
TX |
52 |
$5,200,000 |
Streets/Roads |
-15 |
| East Dallas Veloway Phase I: build a 2-mile multi-use trail that will create a 19-mile continuous trail connecting East Dallas neighborhoods with two DART light rail stations, employment centers, schools, retail centers and recreational facilities |
Dallas |
TX |
18 |
$2,257,920 |
Streets/Roads |
40 |
| Katy Trail Phase IV: build a 2.5-mile multi-use trail from Skillman Street to the Northwest Highway DART Light Rail Station |
Dallas |
TX |
18 |
$2,257,920 |
Streets/Roads |
39 |
| Irving Boulevard/Mockingbid Lane Inersection Improvement Project: add dual left-turn and right-turn lanes on all approaches |
Dallas |
TX |
10 |
$1,240,000 |
Streets/Roads |
23 |
| Lake Tawakoni 144-inch raw water pipeline Phase I |
Dallas |
TX |
450 |
$45,000,000 |
Water |
13 |
| Tawakoni Balancing Reservoir Expansion |
Dallas |
TX |
300 |
$30,000,000 |
Water |
9 |
| Water & wastewater Replacement (In-house) |
Dallas |
TX |
200 |
$20,000,000 |
Water |
9 |
| SW Pipeline (Wintergreen Raod from I-35 to Houston School Road) |
Dallas |
TX |
180 |
$18,000,000 |
Water |
1 |
| Ferris Branch Replacement Construction Phase II - 24,000 lf of pipeline replacement |
Dallas |
TX |
67 |
$6,700,000 |
Water |
1 |
| Appian & Central Low Construction Phase I (AP) |
Dallas |
TX |
65 |
$6,500,000 |
Water |
-3 |
| McKamy, Cottonwood & central Branch Phase I |
Dallas |
TX |
60 |
$6,000,000 |
Water |
1 |
| Water & wastewater main replacement (Phase II) (Dal-Tec) (EV) - 30,000 lf of pipeline replacement |
Dallas |
TX |
60 |
$6,000,000 |
Water |
6 |
| Water & wastewater main replacement construction (HZ)(LB) - 25,000 lf of pipeline replacements |
Dallas |
TX |
32 |
$4,800,000 |
Water |
9 |
| Southside Plant - DLD Field Regrading |
Dallas |
TX |
30 |
$3,000,000 |
Water |
-9 |
| 54-inch wastewater interceptor Turtle Creek from Maple to Cedar Springs |
Dallas |
TX |
22 |
$2,200,000 |
Water |
15 |
| 48-inch DFW line tunneling |
Dallas |
TX |
20 |
$2,000,000 |
Water |
-1 |
| Cullum Street (Waterview to Coit) |
Dallas |
TX |
8 |
$750,000 |
Water |
-8 |
| Apron & Fuel Hydrant System Replacement: Design of concrete apron & fuel hydrant system for new terminal building to be constructed in four phases |
Dallas |
TX |
55 |
$5,500,000 |
Airport |
-8 |
| Construction of Taxiway L extension & repair |
Dallas |
TX |
44 |
$4,400,000 |
Airport |
-2 |
| Airfield Lighting Vault Replacement: Construction of north & west vaults |
Dallas |
TX |
24 |
$2,400,000 |
Airport |
-6 |
| ARFF Vehicle Replacement |
Dallas |
TX |
2 |
$1,000,000 |
Airport |
-25 |
| Design for taxiway A & B reconstruction |
Dallas |
TX |
2 |
$45,000 |
Airport |
0 |
| Drainage reconstruction & sidewalk construction along UP Railroad at Beckley |
Dallas |
TX |
11 |
$1,100,000 |
Amtrak |
13 |
| Construction of Convention Center Hotel |
Dallas |
TX |
3800 |
$386,000,000 |
CDBG |
-2313 |
| Trinity Trails Phases 2,3,4 |
Dallas |
TX |
160 |
$16,000,000 |
CDBG |
8 |
| Continental Avenue modification to pedestrian bridge |
Dallas |
TX |
100 |
$10,000,000 |
CDBG |
-6 |
| Energy efficency & conservation |
Dallas |
TX |
36 |
$3,640,000 |
CDBG |
16 |
| New sidewalks, curbs, etc. |
Dallas |
TX |
30 |
$3,000,000 |
CDBG |
20 |
| Bernal Trail Extension |
Dallas |
TX |
25 |
$2,500,000 |
CDBG |
-12 |
| IH-20 Gateway Park |
Dallas |
TX |
5 |
$500,000 |
CDBG |
-17 |
| Marsalis Avenue sidewalk replacement and pedestrian improvements |
Dallas |
TX |
25 |
$250,000 |
CDBG |
-5 |
| Police Academy Construction |
Dallas |
TX |
620 |
$62,000,000 |
Energy |
-4 |
| Fire Station #6 Energy Efficiency Replacements & Upgrades |
Dallas |
TX |
520 |
$52,000,000 |
Energy |
13 |
| Library Energy Efficiency Upgrades |
Dallas |
TX |
420 |
$42,000,000 |
Energy |
-11 |
| Latino Cultural Center - Phase II design and construction |
Dallas |
TX |
180 |
$18,000,000 |
Energy |
-993 |
| Underhanging of 138kV Transmission Lines along Irving Boulevard |
Dallas |
TX |
40 |
$4,000,000 |
Energy |
11 |
| West Dallas Revitalization Project: Work with low-income neighborhoods to weatherize houses and retrofit them with energy efficient technology, equipment, systems and apppliances. A green collar jobs element will train residents to retrofit such houses |
Dallas |
TX |
250 |
$900,000 |
Energy |
-27 |
| Replacement of lamps in City-owned parking lots with energy efficient LED lights |
Dallas |
TX |
37.5 |
$700,000 |
Energy |
39 |
| Equipment, supplies and tree stock for Great Trinity Forest tree planting (includes site preparation) |
Dallas |
TX |
5 |
$500,000 |
Energy |
-14 |
| Installation of Solar Panels on city, school district bldgs., on streetlights, traffic signals |
Dallas |
TX |
27.5 |
$500,000 |
Energy |
44 |
| Installation of geothermal heat pumps at the proposed site of the Texas Horse Park |
Dallas |
TX |
30 |
$150,000 |
Energy |
-30 |
| Construct 55 dwelling units at Roseland Homes |
Dallas |
TX |
61 |
$6,100,000 |
Housing |
-48 |
| Demolition of Turner Courts & Rhoads Terrace |
Dallas |
TX |
25 |
$2,450,000 |
Housing |
-11 |
| Concrete work at all sites |
Dallas |
TX |
20 |
$2,000,000 |
Housing |
-16 |
| Replace roofs at Cedar Springs |
Dallas |
TX |
9 |
$900,000 |
Housing |
-31 |
| Exterior repairs at Hidden Ridge |
Dallas |
TX |
5 |
$500,000 |
Housing |
-18 |
| Remodel kitchens at scattered sites |
Dallas |
TX |
4 |
$400,000 |
Housing |
-65 |
| Replace roofs at Brooks Manor |
Dallas |
TX |
3 |
$250,000 |
Housing |
-9 |
| Replace roofs at Cliff Manor |
Dallas |
TX |
3 |
$250,000 |
Housing |
-15 |
| Replace elevators at Brooks Manor |
Dallas |
TX |
4 |
$240,000 |
Housing |
-25 |
| Clean lagoon at Lakewest Site |
Dallas |
TX |
2 |
$200,000 |
Housing |
-18 |
| Exterior repairs at at Little Mexico Village |
Dallas |
TX |
1 |
$150,000 |
Housing |
-139 |
| ADA entrance upgrades at all sites |
Dallas |
TX |
1 |
$105,000 |
Housing |
-1 |
| Upgrade the City of Dallas public safety radio system to the 800 Mhz digital spectrum, providing City of Dallas first responder with full regional interoperability |
Dallas |
TX |
30 |
$40,000,000 |
Public Safety |
32 |
| Hire 20 new police officers |
Dallas |
TX |
20 |
$1,500,000 |
Public Safety |
99 |