WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

Jerry Brito talks about the new Stimulus Watch site on WUSA... 11/18/2009

Jerry Brito talks about the new Stimulus Watch site on WUSA Channel 9 News.

Help Washington Watch track congressional earmarks 07/23/2009

Stimulus Watch was inspired in part by Washington Watch, a site that lets you find, rate, describe, and discuss legislation…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Fife, Washington

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Fife is $32,054,000

Description City State Jobs Cost Program Type Vote Ratio
70th and Valley Corridor: 70th Avenue grade separation, a 4-lane bridge over the Union Pacific Railroad Fife WA 500 $25,000,000 Streets/Roads 7
70th and Valley Corridor, including widening 5,000 feet of Valley Avenue from 2 to 4 lanes and 1,000 feet of 70th Avenue from 2/3 to 5/6 lanes Fife WA 260 $3,600,000 Streets/Roads 5
54th Avenue East, Pacific Avenue East to North City Limits - Pavement preservation, including grind, overlay, and utility adjustments for 5,000 feet of 5-lane arterial Fife WA 32 $820,000 Streets/Roads 3
Pacific Highway East (Old 99) Port of Tacoma Road to West City Limits - Pavement preservation, including grind, overlay and utility adjustments for 3,200 feet of 5-lane arterial Fife WA 22 $550,000 Streets/Roads 4
Pacific Highway East (Old 99) Alexander Avenue to Willow Road - Pavement preservation including grind, overlay, and utility adjustments for 2,000 feet of 5-lane arterial Fife WA 13 $300,000 Streets/Roads 4
70th Avenue East, 20th Street East to North City Limits - pavement preservation, including grind, overlay, and utility adjustments to 1,200 feet of 2-lane arterial Fife WA 8 $180,000 Streets/Roads 3
Intertie at Puyallup service territory boundary, including 3,000 feet of 12-inch water main and pump station Fife WA 20 $980,000 Water 4
Sewer pump station upgrades, including 15 pumps, an odor control system, and two generator sets, at a total of 8 pump stations Fife WA 8 $214,000 Water 5
12-inch main replacement - 500 feet of new ductile iron pipe to replace corroded cast iron pipe in casing under I-5, just west of 54th Avenue East Fife WA 6 $160,000 Water 7
Swim Center: replacement of 25-year-old air handler, condensing unit, and domestic water heater, including installation of roof scuttle. Fife WA 5 $250,000 CDBG -9