| Alley Reconstruction |
Hollywood |
FL |
0 |
$5,000,000 |
Streets/Roads |
-11 |
| Street Resurfacing |
Hollywood |
FL |
0 |
$2,000,000 |
Streets/Roads |
-8 |
| Outfall Rule Change Compliance Projects (deep wells with HLD) |
Hollywood |
FL |
0 |
$92,800,000 |
Water |
-11 |
| Continue Gravity System Condition Assessment and Renewl/Repl (I/I) |
Hollywood |
FL |
0 |
$20,000,000 |
Water |
-9 |
| Grit Removal System Rehab and Replacement |
Hollywood |
FL |
0 |
$19,500,000 |
Water |
-6 |
| Deep Injection Well for MS/RO Concentrate Disposal |
Hollywood |
FL |
0 |
$17,500,000 |
Water |
-8 |
| Effluent PS Rehab |
Hollywood |
FL |
0 |
$14,641,000 |
Water |
-4 |
| Bar Screens Rehab and Repairs |
Hollywood |
FL |
0 |
$14,000,000 |
Water |
-19 |
| Construct McKinley St. Parallel Interceptor |
Hollywood |
FL |
0 |
$14,000,000 |
Water |
-10 |
| Lift Station Conversions/Upgrades |
Hollywood |
FL |
0 |
$8,400,000 |
Water |
-4 |
| Install US 441 / State Road 7 Corridor Sewer |
Hollywood |
FL |
0 |
$8,000,000 |
Water |
-4 |
| Taft St. Interceptor Rehab |
Hollywood |
FL |
0 |
$7,000,000 |
Water |
-8 |
| Dixie Highway Corridor |
Hollywood |
FL |
0 |
$6,000,000 |
Water |
-10 |
| I/I Basins H-11, H-15W and H-31 |
Hollywood |
FL |
0 |
$5,200,000 |
Water |
-6 |
| Reuse System Storage Tank |
Hollywood |
FL |
0 |
$5,000,000 |
Water |
-4 |
| Water Main Replacement Program |
Hollywood |
FL |
0 |
$5,000,000 |
Water |
-2 |
| WS Offsetting Reuse Planning, Demonstration and Related Activities. |
Hollywood |
FL |
0 |
$5,000,000 |
Water |
-6 |
| Sludge Cake Pumps Repl and Misc Repairs |
Hollywood |
FL |
0 |
$4,400,000 |
Water |
-2 |
| Floridan Wells F14 & F15 and Associated Transmission Mains (DCA project) |
Hollywood |
FL |
0 |
$4,000,000 |
Water |
-3 |
| Utilities Relocations to Support SR7 Widening |
Hollywood |
FL |
0 |
$4,000,000 |
Water |
-3 |
| West Hollywood Pumping and Storage Facility |
Hollywood |
FL |
0 |
$4,000,000 |
Water |
-3 |
| De-grit Oxygenation Trains |
Hollywood |
FL |
0 |
$3,000,000 |
Water |
-4 |
| Reactor Feed Pumps Replacement at the Residuals Facility |
Hollywood |
FL |
0 |
$3,000,000 |
Water |
-3 |
| Replace R.O. Train "B" |
Hollywood |
FL |
0 |
$3,000,000 |
Water |
-2 |
| RO Train D (2 mgd) |
Hollywood |
FL |
0 |
$3,000,000 |
Water |
-1 |
| RO Train E (2 mgd) |
Hollywood |
FL |
0 |
$3,000,000 |
Water |
-2 |
| Intracoastal Crossing Pipe Replacement (Lift Station E-3 Force Mains) |
Hollywood |
FL |
0 |
$2,590,000 |
Water |
-1 |
| Painting and Restoration of Two (2) Elevated Water Tanks |
Hollywood |
FL |
0 |
$2,500,000 |
Water |
-8 |
| Clarifier Nos. 5-6 Rehabilitation |
Hollywood |
FL |
0 |
$2,150,000 |
Water |
-2 |
| Rehab of Clarifier Nos. 5-8 Flow Distribution Box |
Hollywood |
FL |
0 |
$2,100,000 |
Water |
-1 |
| High Service Pump Facility Rehabilitation and Upgrade |
Hollywood |
FL |
0 |
$2,000,000 |
Water |
-1 |
| Painting and Restoration of Water Treatment Plant Facilities |
Hollywood |
FL |
0 |
$2,000,000 |
Water |
-4 |
| Effluent PS-Gravity Disposal System Replacement and Other Repairs |
Hollywood |
FL |
0 |
$1,600,000 |
Water |
-2 |
| Replace Lime Slakers and Lime Feed System (4 units) |
Hollywood |
FL |
0 |
$1,600,000 |
Water |
-1 |
| Retrofit RO Skid-Train A |
Hollywood |
FL |
0 |
$1,600,000 |
Water |
-1 |
| Replace PS E-02 Force Main and ICW Crossing |
Hollywood |
FL |
0 |
$1,500,000 |
Water |
-1 |
| Floridan Wells F10 & F13 Wellhead Piping, Pumps and Vaults (DCA project) |
Hollywood |
FL |
0 |
$1,400,000 |
Water |
-1 |
| Replacement and/or Rehabilitation of Reuse Facilities |
Hollywood |
FL |
0 |
$1,330,000 |
Water |
0 |
| Replace PS N-04 Pumps, Force Main and Gravity Piping |
Hollywood |
FL |
0 |
$1,158,000 |
Water |
0 |
| Computer Control System Upgrade - Wastewater Treatment Plant |
Hollywood |
FL |
0 |
$1,100,000 |
Water |
1 |
| Evaluation & Replacement of Flow Meter at Water Treatment Plant |
Hollywood |
FL |
0 |
$1,100,000 |
Water |
-1 |
| WTP Emergency Generator #4. |
Hollywood |
FL |
0 |
$1,100,000 |
Water |
1 |
| Oxygenation Trains Nos. 1-5 Rehab & 42" Influent CIP Liner |
Hollywood |
FL |
0 |
$1,030,000 |
Water |
-1 |
| 1500 KW generator (#3) as backup for entire plant. Switchgear and instrumentation. |
Hollywood |
FL |
0 |
$1,000,000 |
Water |
1 |
| Expand Blend Tank |
Hollywood |
FL |
0 |
$1,000,000 |
Water |
-4 |
| Water Distribution Upgrades |
Hollywood |
FL |
0 |
$1,000,000 |
Water |
-1 |
| Water Distribution Upgrades at the North End of A1A |
Hollywood |
FL |
0 |
$1,000,000 |
Water |
0 |
| Water Distribution Upgrades |
Hollywood |
FL |
0 |
$810,000 |
Water |
0 |
| Addition of 2 New Sodium Hypochlorite Generation Cells and Related Storage Tanks |
Hollywood |
FL |
0 |
$805,000 |
Water |
-2 |
| Continue GIS Database Improvement |
Hollywood |
FL |
0 |
$800,000 |
Water |
3 |
| Develop Collection/Transmission System Hydraulic Model |
Hollywood |
FL |
0 |
$800,000 |
Water |
1 |
| Mechanical Rehab of Three Floridan Wells (F2,F3 & F5) |
Hollywood |
FL |
0 |
$800,000 |
Water |
0 |
| Conversion / Upgrade of Sewer PS W-03 (currently under design) |
Hollywood |
FL |
0 |
$709,000 |
Water |
1 |
| Upgrade the Existing MS Feed Pumps to VFD |
Hollywood |
FL |
0 |
$650,000 |
Water |
-1 |
| Replace PS E-07 Pumps |
Hollywood |
FL |
0 |
$600,000 |
Water |
-1 |
| PLC Replacement at SRWWTP |
Hollywood |
FL |
0 |
$550,000 |
Water |
3 |
| Conservation Phase III |
Hollywood |
FL |
0 |
$500,000 |
Water |
1 |
| New 14,000 gpm High Service Pump (HSP) |
Hollywood |
FL |
0 |
$500,000 |
Water |
0 |
| Upgrade the remote telemetry site PLCs and in-plant PLCs |
Hollywood |
FL |
0 |
$480,000 |
Water |
2 |
| Replace PS N-03 Pumps, Force Main and Gravity Piping |
Hollywood |
FL |
0 |
$478,000 |
Water |
-2 |
| Replace PS N-02 Pumps |
Hollywood |
FL |
0 |
$448,000 |
Water |
-1 |
| Repair or Upgrading of Flow Distribution Box. North and South Electric Service Centers |
Hollywood |
FL |
0 |
$440,000 |
Water |
-1 |
| Water Distribution Upgrades |
Hollywood |
FL |
0 |
$423,000 |
Water |
-1 |
| Water Treatment Plant South Header Rehabilitation |
Hollywood |
FL |
0 |
$360,000 |
Water |
-1 |
| Repair of Cracks in Filters and Administration Building |
Hollywood |
FL |
0 |
$350,000 |
Water |
-2 |
| Mechanical Integrity Test for Injection Wells |
Hollywood |
FL |
0 |
$330,000 |
Water |
-2 |
| Acid (Pre-Treatment) Pipe Replacement plus Addition of Pipe Post-Treatment |
Hollywood |
FL |
0 |
$300,000 |
Water |
-1 |
| Conservation Phase II |
Hollywood |
FL |
0 |
$300,000 |
Water |
2 |
| Influent Pump Station Repairs |
Hollywood |
FL |
0 |
$300,000 |
Water |
-1 |
| RAS Pump Stations Repairs and Upgrades |
Hollywood |
FL |
0 |
$270,000 |
Water |
-1 |
| WAS System Rehab |
Hollywood |
FL |
0 |
$250,000 |
Water |
-1 |
| Water Distribution Upgrades |
Hollywood |
FL |
0 |
$240,000 |
Water |
-1 |
| Clean, Recoat and Reseal the Containment Area for the Chemical Storage Tanks |
Hollywood |
FL |
0 |
$200,000 |
Water |
0 |
| Conservation Phase I |
Hollywood |
FL |
0 |
$200,000 |
Water |
-1 |
| Painting Wastewater Treatment Plant |
Hollywood |
FL |
0 |
$200,000 |
Water |
-2 |
| Water Distribution Upgrades |
Hollywood |
FL |
0 |
$164,000 |
Water |
1 |
| Upgrade Ammonia System from Gas to Liquid |
Hollywood |
FL |
0 |
$160,000 |
Water |
-3 |
| Water Distribution Upgrades |
Hollywood |
FL |
0 |
$144,000 |
Water |
-1 |
| Chlorination Facility Rehab |
Hollywood |
FL |
0 |
$140,000 |
Water |
2 |
| Water Distribution Upgrades |
Hollywood |
FL |
0 |
$130,000 |
Water |
0 |
| Switchgear Cleaning, Recalibrating and Testing |
Hollywood |
FL |
0 |
$125,000 |
Water |
0 |
| Assessment of Steel Filters and Spiractors Structural Integrity |
Hollywood |
FL |
0 |
$100,000 |
Water |
0 |
| Integrate Ammonia Feed System into the Plant's SCADA System |
Hollywood |
FL |
0 |
$100,000 |
Water |
0 |
| Integrate Sodium Hypochlorite Feed System into the Plant's SCADA System |
Hollywood |
FL |
0 |
$100,000 |
Water |
-2 |
| Provide High Level Monitoring and Trending of Data Values from the LIMS and SCADA Systems |
Hollywood |
FL |
0 |
$100,000 |
Water |
-2 |
| Wastewater Capacity Analysis |
Hollywood |
FL |
0 |
$100,000 |
Water |
-3 |
| Water Distribution Upgrades |
Hollywood |
FL |
0 |
$96,000 |
Water |
-4 |
| Water Distribution Upgrades |
Hollywood |
FL |
0 |
$87,000 |
Water |
-2 |
| Water Distribution Upgrades |
Hollywood |
FL |
0 |
$84,000 |
Water |
-2 |
| Addition of Valve Controls and Misc. Repairs to Injection Wells |
Hollywood |
FL |
0 |
$80,000 |
Water |
-2 |
| Plan Assessment of Large-Diameter Reinforced Concrete Pipe Condition |
Hollywood |
FL |
0 |
$80,000 |
Water |
0 |
| SRWWTP/Collection/Transmission System Data Historian Upgrade |
Hollywood |
FL |
0 |
$75,000 |
Water |
-2 |
| Installation of Chemical Feed System Flowmeters |
Hollywood |
FL |
0 |
$50,000 |
Water |
-2 |
| Replacement of the Reclaimed Water Pumps |
Hollywood |
FL |
0 |
$50,000 |
Water |
0 |
| Water Distribution Upgrades |
Hollywood |
FL |
0 |
$48,000 |
Water |
-3 |
| Water Distribution Upgrades |
Hollywood |
FL |
0 |
$34,000 |
Water |
-1 |
| Streetlight Replacement to Energy Efficient Fixtures |
Hollywood |
FL |
0 |
$8,000,000 |
Energy |
1 |
| Convert a closed trash transfer station into a neighborhood friendly green waste mulching/recycling center. |
Hollywood |
FL |
12 |
$2,500,000 |
Energy |
11 |
| Energy Efficient Upgrades to City Facilities |
Hollywood |
FL |
0 |
$2,000,000 |
Energy |
6 |
| Retrofit of the Public Works Operations Center to harness wind power for the building's energy needs. |
Hollywood |
FL |
2 |
$1,300,000 |
Energy |
6 |
| Police Administration Facility |
Hollywood |
FL |
0 |
$50,000,000 |
Public Safety |
-42 |
| Fire Station Replacement |
Hollywood |
FL |
0 |
$7,500,000 |
Public Safety |
0 |