| Low Sufficiency Bridges (replacement) |
Jackson |
MS |
120 |
$28,000,000 |
Streets/Roads |
16 |
| West Street Reconstruction (George St
to Woodrow Wilson Ave) |
Jackson |
MS |
125 |
$25,000,000 |
Streets/Roads |
5 |
| Lynch St Extension Reconstruction
(US 80 to Hwy 18) |
Jackson |
MS |
30 |
$17,000,000 |
Streets/Roads |
-5 |
| Lynch Street Improvements
(Highway 80 - Highway 18) |
Jackson |
MS |
85 |
$17,000,000 |
Streets/Roads |
2 |
| South State Street Railroad Overpass
Construction |
Jackson |
MS |
55 |
$12,500,000 |
Streets/Roads |
16 |
| Lynch Street Improvements
(JSU - Highway 80) |
Jackson |
MS |
70 |
$12,500,000 |
Streets/Roads |
-3 |
| McDowell Road (I-55 - Highway 18)
resurfacing |
Jackson |
MS |
55 |
$12,000,000 |
Streets/Roads |
13 |
| Gallatin St (McDowell-Monument) resurfacing |
Jackson |
MS |
40 |
$9,500,000 |
Streets/Roads |
13 |
| Raymond Rd(Terry-West Highland)resurfacing |
Jackson |
MS |
45 |
$9,500,000 |
Streets/Roads |
8 |
| Fortification Street Utility Relocation |
Jackson |
MS |
45 |
$8,000,000 |
Streets/Roads |
15 |
| West County Line Road Phase 1B |
Jackson |
MS |
50 |
$8,000,000 |
Streets/Roads |
10 |
| Mayes Street Reconstruction |
Jackson |
MS |
75 |
$7,000,000 |
Streets/Roads |
8 |
| Siwell Rd Phase 2 |
Jackson |
MS |
75 |
$5,500,000 |
Streets/Roads |
11 |
| Bullard Street (Zoo - Boling) resurfacing |
Jackson |
MS |
20 |
$3,500,000 |
Streets/Roads |
6 |
| Capitol Street (Ellis - Boling) resurfacing |
Jackson |
MS |
15 |
$3,000,000 |
Streets/Roads |
9 |
| Lynch Street - Highway 18 Interchange |
Jackson |
MS |
10 |
$2,000,000 |
Streets/Roads |
0 |
| Robinson Rd Extension(Hwy 18-McDowell) resurfacing |
Jackson |
MS |
10 |
$2,000,000 |
Streets/Roads |
8 |
| Hwy 18 & Lynch St Reconstruction |
Jackson |
MS |
25 |
$2,000,000 |
Streets/Roads |
2 |
| Siwell Rd/McCleur Rd Intersection
Improvements |
Jackson |
MS |
50 |
$1,500,000 |
Streets/Roads |
9 |
| South Street Railroad Overpass |
Jackson |
MS |
10 |
$1,000,000 |
Streets/Roads |
7 |
| South Street Bridge Replacement |
Jackson |
MS |
50 |
$1,000,000 |
Streets/Roads |
6 |
| South Street Underpass Renovations |
Jackson |
MS |
50 |
$750,000 |
Streets/Roads |
2 |
| Parking Meter Modernization |
Jackson |
MS |
25 |
$320,000 |
Streets/Roads |
-17 |
| Terry Rd & Elton Rd/Lakeshore Dr
Intersection Improvements |
Jackson |
MS |
35 |
$300,000 |
Streets/Roads |
10 |
| Westhaven Blvd Bridge Replacement |
Jackson |
MS |
25 |
$125,000 |
Streets/Roads |
4 |
| Old Capitol Green Project |
Jackson |
MS |
4000 |
$57,000,000 |
Water |
-65 |
| Lynch Creek Interceptor (Segment B) |
Jackson |
MS |
85 |
$15,000,000 |
Water |
2 |
| 48" Water Transmission Main (#5) |
Jackson |
MS |
50 |
$9,000,000 |
Water |
5 |
| 48" Water Transmission Main (#4) |
Jackson |
MS |
45 |
$8,500,000 |
Water |
3 |
| 54" Water Transmission Main (#1) |
Jackson |
MS |
45 |
$8,500,000 |
Water |
3 |
| Central Business District Water Improvements |
Jackson |
MS |
26 |
$6,570,000 |
Water |
3 |
| Maddox System Booster Station |
Jackson |
MS |
24 |
$6,000,000 |
Water |
0 |
| Elevated Storage Tanks |
Jackson |
MS |
23 |
$5,750,000 |
Water |
-5 |
| Hardy Creek Interceptor(i-55 - Reno Drive) |
Jackson |
MS |
20 |
$5,000,000 |
Water |
1 |
| Lynch Creek Interceptor (Segment D) |
Jackson |
MS |
25 |
$5,000,000 |
Water |
0 |
| Three Mile Interceptro (CN Railroad - Terry Rd) |
Jackson |
MS |
20 |
$4,000,000 |
Water |
1 |
| 2" & 4" Water Line Improvements (#8) |
Jackson |
MS |
15 |
$3,000,000 |
Water |
2 |
| 2" & 4" Water Line Improvement (#7) |
Jackson |
MS |
15 |
$2,750,000 |
Water |
2 |
| Water System SCADA control upgrades |
Jackson |
MS |
2 |
$600,000 |
Water |
0 |
| AMR Installation Residential Meter Boxes |
Jackson |
MS |
4 |
$40,000 |
Water |
-5 |
| AMR Installation Commerical Meter Boxes |
Jackson |
MS |
2 |
$20,000 |
Water |
-1 |
| AMR Installation Man Holes |
Jackson |
MS |
2 |
$20,000 |
Water |
0 |
| Runway extension at JEIA |
Jackson |
MS |
200 |
$30,000,000 |
Airport |
4 |
| Expansion of International Drive to 4 lanes - JEIA |
Jackson |
MS |
150 |
$15,000,000 |
Airport |
-14 |
| Runway extension at Hawkins Field |
Jackson |
MS |
150 |
$15,000,000 |
Airport |
-13 |
| Relocation of ATC Tower - JEIA |
Jackson |
MS |
200 |
$15,000,000 |
Airport |
-4 |
| Pavement Rehabilitation - JEIA |
Jackson |
MS |
40 |
$6,270,000 |
Airport |
-3 |
| Installation of Perimeter Road - Airside JEIA |
Jackson |
MS |
40 |
$5,000,000 |
Airport |
-2 |
| Rehabilitation of Storm Water Infrastructure - JEIA |
Jackson |
MS |
45 |
$3,135,000 |
Airport |
-1 |
| Access control at Hawkins Field |
Jackson |
MS |
35 |
$3,000,000 |
Airport |
-7 |
| Passenger Boarding Bridges - JEIA |
Jackson |
MS |
10 |
$2,672,300 |
Airport |
-1 |
| Access Control Security - JEIA |
Jackson |
MS |
50 |
$1,914,230 |
Airport |
1 |
| Hawkins Field storm drainage |
Jackson |
MS |
10 |
$900,000 |
Airport |
-2 |
| Apron Repairs - JEIA |
Jackson |
MS |
20 |
$491,000 |
Airport |
1 |
| Master Plan Update - JEIA |
Jackson |
MS |
10 |
$392,739 |
Airport |
3 |
| Hawkins Field signage and markings |
Jackson |
MS |
12 |
$332,500 |
Airport |
-3 |
| Disparity Study |
Jackson |
MS |
5 |
$300,000 |
Airport |
-41 |
| Hawkins Field Stormwater Drainage Improvements Phase 1 |
Jackson |
MS |
5 |
$171,000 |
Airport |
-2 |
| Dispatch Consol and Radios |
Jackson |
MS |
0 |
$95,000 |
Airport |
-4 |
| Natatoriums (4) with Olympic pools
(year round use) |
Jackson |
MS |
55 |
$10,000,000 |
CDBG |
-73 |
| White Oak Creek From Adkins Blvd to Old Canton Road |
Jackson |
MS |
60 |
$10,000,000 |
CDBG |
11 |
| Buddy Butts Park Improvements |
Jackson |
MS |
25 |
$5,000,000 |
CDBG |
13 |
| Beasley Road Improvements From Watkins Drive to I-55 Frontage Road |
Jackson |
MS |
35 |
$5,000,000 |
CDBG |
4 |
| West Street From MeadowBrook/Hanging Moss Intersection to Lamar Street |
Jackson |
MS |
35 |
$5,000,000 |
CDBG |
1 |
| Splash Parks (7) |
Jackson |
MS |
20 |
$3,500,000 |
CDBG |
-81 |
| Capital Street Improvements From Ellis Avenue to Gallatin Street |
Jackson |
MS |
28 |
$3,500,000 |
CDBG |
5 |
| Fortification Street Improvements From Bailey Avenue to Woodrow Wilson |
Jackson |
MS |
28 |
$3,500,000 |
CDBG |
15 |
| Gallatin Street Improvements From Capital Street to I-20 |
Jackson |
MS |
28 |
$3,500,000 |
CDBG |
5 |
| State Street Improvementst From Woodrow Wilson to Northside Drive |
Jackson |
MS |
28 |
$3,500,000 |
CDBG |
14 |
| Design and construction of 30 unit condo development in Farish Street Historic District |
Jackson |
MS |
25 |
$3,400,000 |
CDBG |
-39 |
| Clinton Blvd Street Improvements From I-220 to Clinton/Jackson line |
Jackson |
MS |
30 |
$3,000,000 |
CDBG |
6 |
| Medgar Evers Street Improvements From Woodrow Wilson to Northside Drive |
Jackson |
MS |
30 |
$3,000,000 |
CDBG |
3 |
| Renovations and roof repairs for 5 community centers: Grove Park Community Center, Jayne Ave. Community Center, Presidential Hills Community Center, Westside Community Center, and Champion Community Center |
Jackson |
MS |
30 |
$3,000,000 |
CDBG |
3 |
| Meadowbrook Road Street Improvements From State Street to I-55 Frontage Road |
Jackson |
MS |
16 |
$2,500,000 |
CDBG |
6 |
| Manhattan Street Bridge & Street Improvements From Meadowbrook Road to Cedars of Lebanon |
Jackson |
MS |
25 |
$2,500,000 |
CDBG |
3 |
| State Street Improvements From Woodrow Wilson to Lakeland Drive |
Jackson |
MS |
14 |
$2,200,000 |
CDBG |
7 |
| Boling Street Improvements |
Jackson |
MS |
25 |
$2,000,000 |
CDBG |
2 |
| Northside Drive From Bailey Avenue to I-55 Frontage Rd. |
Jackson |
MS |
25 |
$2,000,000 |
CDBG |
2 |
| Terry Road Street Improvements From McDowell Road to McCleur Road |
Jackson |
MS |
25 |
$2,000,000 |
CDBG |
14 |
| Morehouse Street |
Jackson |
MS |
20 |
$1,800,000 |
CDBG |
1 |
| South Street Bridge |
Jackson |
MS |
20 |
$1,800,000 |
CDBG |
1 |
| Shaw Road Street Improvements |
Jackson |
MS |
26 |
$1,600,000 |
CDBG |
2 |
| Eubanks Creek From Northview Drive to Old Canton Road |
Jackson |
MS |
6 |
$1,500,000 |
CDBG |
0 |
| Caney Creek From Terry Road to Meadowlane including Sunset Terrace |
Jackson |
MS |
7 |
$1,500,000 |
CDBG |
2 |
| Lynch Creek Drainage Improvements on Queen Eleanor |
Jackson |
MS |
7 |
$1,500,000 |
CDBG |
1 |
| Eubanks Phase II |
Jackson |
MS |
12 |
$1,500,000 |
CDBG |
-1 |
| Cedars of Lebanon Bridge Replacement |
Jackson |
MS |
18 |
$1,500,000 |
CDBG |
1 |
| Street Reconstruction of Mosley Drive |
Jackson |
MS |
15 |
$1,300,000 |
CDBG |
1 |
| Eubanks Creek From Meadow Drive to Northside Drive |
Jackson |
MS |
6 |
$1,000,000 |
CDBG |
1 |
| Tributary of Belhaven Creek From Riverside Drive to Belhaven Creek |
Jackson |
MS |
6 |
$1,000,000 |
CDBG |
-1 |
| Purple Creek Stream #2 From Northpointe Drive to Rolling Meadows Drive |
Jackson |
MS |
8 |
$1,000,000 |
CDBG |
1 |
| Westhaven Road Bridge Replacement |
Jackson |
MS |
15 |
$1,000,000 |
CDBG |
1 |
| Renovation of Viola Lake House for Community Center |
Jackson |
MS |
18 |
$1,000,000 |
CDBG |
-11 |
| Construction of infrastructure improvements for Morehouse Street Project |
Jackson |
MS |
20 |
$1,000,000 |
CDBG |
1 |
| Design services and funding for infrastructure improvements for Bon Air Housing Development |
Jackson |
MS |
20 |
$1,000,000 |
CDBG |
-13 |
| Town Creek Tributary No. 4 From Medgar Evers to Erie Street |
Jackson |
MS |
6 |
$800,000 |
CDBG |
1 |
| Town Creek Tributary No. 5 From Northside Drive to Utah Street |
Jackson |
MS |
6 |
$800,000 |
CDBG |
0 |
| Tributary of Trahon Creek on Swan Lake Cove |
Jackson |
MS |
6 |
$800,000 |
CDBG |
0 |
| Belhaven Creek From Woodrow Wilson to Riverside Drive |
Jackson |
MS |
7 |
$800,000 |
CDBG |
0 |
| Renovation of George Washington Carver Library for Community Center |
Jackson |
MS |
15 |
$800,000 |
CDBG |
-7 |
| Design and construction of Historic Garden in the Farish Street Historic District |
Jackson |
MS |
20 |
$800,000 |
CDBG |
-21 |
| Legion Park softball field (4-plex) |
Jackson |
MS |
5 |
$750,000 |
CDBG |
-17 |
| Town Creek Tributary No. 4 From Main Street to Channel |
Jackson |
MS |
8 |
$500,000 |
CDBG |
2 |
| Sunset Drive Bridge Replacement |
Jackson |
MS |
12 |
$500,000 |
CDBG |
1 |
| Macon Street Drainage Improvements |
Jackson |
MS |
3 |
$400,000 |
CDBG |
1 |
| Mississippi Art Center Roof |
Jackson |
MS |
5 |
$350,000 |
CDBG |
6 |
| Mary C. Jones, Early Childhood Development Center Roof |
Jackson |
MS |
4 |
$300,000 |
CDBG |
2 |
| Smith Robertson Community Center Roof |
Jackson |
MS |
2 |
$150,000 |
CDBG |
3 |
| Smith Robertson Museum & Cultural Center Roof |
Jackson |
MS |
2 |
$150,000 |
CDBG |
-1 |
| Jackson Zoo - Remove Parkins Building |
Jackson |
MS |
0 |
$60,000 |
CDBG |
-4 |
| Mississippi Municipal Art Gallery Roof |
Jackson |
MS |
2 |
$60,000 |
CDBG |
0 |
| Jackson Zoo - Water.Drainage Lines - Noted in plan in four sections - one and two at the same time |
Jackson |
MS |
0 |
$40,700 |
CDBG |
3 |
| Jackson Zoo - Change the Education Building to the Marketing/Events Building, repair roof and other general maintenance repairs |
Jackson |
MS |
0 |
$34,000 |
CDBG |
2 |
| Jackson Zoo- Roof replaced on facilities office |
Jackson |
MS |
0 |
$27,775 |
CDBG |
1 |
| Jackson Zoo - Remove / add another metal storage building (Old Green Bird Barn) |
Jackson |
MS |
0 |
$23,500 |
CDBG |
-2 |
| Jackson Zoo - Administration Building needs painting, restroom work and the heat pump replaced |
Jackson |
MS |
0 |
$6,950 |
CDBG |
3 |
| Landfill Redemption (Festival Park Construction) |
Jackson |
MS |
30 |
$10,000,000 |
Energy |
-3 |
| JATRAN Administrative Building
(LEEDS compliant) |
Jackson |
MS |
12 |
$5,500,000 |
Energy |
-3 |
| Impound Lot/facility |
Jackson |
MS |
20 |
$4,000,000 |
Energy |
-12 |
| Environmental Recycling and Green Distribution Center |
Jackson |
MS |
20 |
$3,000,000 |
Energy |
3 |
| Playground safety enhancements |
Jackson |
MS |
14 |
$2,700,000 |
Energy |
-7 |
| VA Park Lighting Improvements |
Jackson |
MS |
10 |
$2,000,000 |
Energy |
-3 |
| Mynelle Garden Improvements |
Jackson |
MS |
25 |
$1,500,000 |
Energy |
-1 |
| Battlefield Park Improvements |
Jackson |
MS |
30 |
$1,500,000 |
Energy |
-31 |
| Josh Halbert Gardens Improvements |
Jackson |
MS |
7 |
$1,000,000 |
Energy |
-8 |
| 509 Pearl Street Building Improvements |
Jackson |
MS |
10 |
$1,000,000 |
Energy |
-3 |
| City Baseball Fields (48) Lighting Improvements |
Jackson |
MS |
10 |
$1,000,000 |
Energy |
-11 |
| Solar Panels for all community centers operated by the City |
Jackson |
MS |
20 |
$1,000,000 |
Energy |
1 |
| North State Street Pedestrian/
Bicycle/Signal Improvements |
Jackson |
MS |
35 |
$650,000 |
Energy |
2 |
| Landfill Redemption (McDowell Road) |
Jackson |
MS |
10 |
$500,000 |
Energy |
2 |
| Traffic Signal LED Retrofit and Meter Installation |
Jackson |
MS |
10 |
$300,000 |
Energy |
-1 |
| Tougaloo Community Center Roof |
Jackson |
MS |
2 |
$250,000 |
Energy |
-2 |
| Oil/Water Separator |
Jackson |
MS |
10 |
$225,000 |
Energy |
3 |
| Interstate 55 Alternate Signal Timing Plans |
Jackson |
MS |
10 |
$200,000 |
Energy |
0 |
| Rain garden construction projects around roadway outfalls and public buildings |
Jackson |
MS |
10 |
$200,000 |
Energy |
-2 |
| Creek Screening and Sampling Investigating discharge |
Jackson |
MS |
6 |
$180,000 |
Energy |
0 |
| Golden Key Community Center Roof |
Jackson |
MS |
2 |
$150,000 |
Energy |
-1 |
| T. L. Community Center Roof |
Jackson |
MS |
2 |
$150,000 |
Energy |
1 |
| New asphalt around garage |
Jackson |
MS |
10 |
$125,000 |
Energy |
-8 |
| Green Recycling and Processing Project (Landfill and Streets) |
Jackson |
MS |
15 |
$120,000 |
Energy |
1 |
| UMC Medical Mall Signal Synchronization Plan |
Jackson |
MS |
10 |
$115,000 |
Energy |
-3 |
| Needs internal building structure repairs |
Jackson |
MS |
6 |
$100,000 |
Energy |
-1 |
| 2 Equipment and Maintenance Operators |
Jackson |
MS |
4 |
$98,001 |
Energy |
-3 |
| Program Management |
Jackson |
MS |
2 |
$85,000 |
Energy |
-6 |
| Landfill Scale and road Development |
Jackson |
MS |
3 |
$75,000 |
Energy |
1 |
| Open Dumping Surveillance System |
Jackson |
MS |
3 |
$75,000 |
Energy |
-2 |
| Public Outreach and Education |
Jackson |
MS |
4 |
$75,000 |
Energy |
-16 |
| Additional staff to maintain post construction strucrural controls |
Jackson |
MS |
2 |
$70,000 |
Energy |
-8 |
| Storm Flo Screen for litter and solids removal in flood prone areas |
Jackson |
MS |
2 |
$60,000 |
Energy |
1 |
| OB Traps constinous 24 hour monitoring of storm water out falls |
Jackson |
MS |
3 |
$60,000 |
Energy |
1 |
| New asphalt around garage |
Jackson |
MS |
0 |
$50,000 |
Energy |
-11 |
| Storm Water Monitoring Equipment |
Jackson |
MS |
3 |
$50,000 |
Energy |
-2 |
| Berm around Facility |
Jackson |
MS |
4 |
$50,000 |
Energy |
-8 |
| In house storm water testing equipment |
Jackson |
MS |
2 |
$25,000 |
Energy |
-3 |
| Outside storage building needs new hip roof and replacement of structural wood |
Jackson |
MS |
4 |
$25,000 |
Energy |
-3 |
| Property acquistion and construction of 80 unit multifamily housing in Historic Farish Street District |
Jackson |
MS |
50 |
$6,500,000 |
Housing |
-30 |
| Construction of 40 single family affordable housing units in Bon Air Subdivision |
Jackson |
MS |
30 |
$4,000,000 |
Housing |
-37 |
| Property acquistion and construction of 30 single family housing units in Historic Farish Street District |
Jackson |
MS |
30 |
$3,800,000 |
Housing |
-21 |
| Construction of 20 units of affordable housing in Logino Subdivision |
Jackson |
MS |
15 |
$2,500,000 |
Housing |
-25 |
| Construction of 15 units of affordable housing in Royal Manor Subdivision |
Jackson |
MS |
12 |
$1,875,000 |
Housing |
-22 |
| Adding to COPS Grants to hire Police Officers to reach recommended staffing |
Jackson |
MS |
180 |
$6,575,680 |
Public Safety |
20 |
| Four Ladder Trucks (Fire Department) |
Jackson |
MS |
0 |
$4,200,000 |
Public Safety |
14 |
| 60 Fire Fighters - Hiring fire fighters to reach recommended staffing |
Jackson |
MS |
60 |
$1,959,000 |
Public Safety |
24 |
| 50 Police Cruisers |
Jackson |
MS |
17 |
$1,050,000 |
Public Safety |
11 |
| Mobile Command Unit for Jackson Police Department |
Jackson |
MS |
0 |
$400,000 |
Public Safety |
-13 |
| Explosive Ordinance Disposal Unit |
Jackson |
MS |
0 |
$356,500 |
Public Safety |
-3 |
| Think Stream Program |
Jackson |
MS |
0 |
$238,000 |
Public Safety |
-17 |
| Bearcat Tactical Armored Vehicle |
Jackson |
MS |
0 |
$226,720 |
Public Safety |
-24 |
| Fitness Equipment/Renovations for Training Academy Weight Room |
Jackson |
MS |
0 |
$60,000 |
Public Safety |
-21 |
| Handheld Laser Radar |
Jackson |
MS |
0 |
$41,690 |
Public Safety |
-11 |
| Murrah High School - Replacement of 26 year old heating, ventilation and air conditioning system (HVAC) in order to improve energy efficiency to comply with Energy Star Rating and to improve indoor air quality |
Jackson |
MS |
15 |
$4,200,000 |
Schools |
10 |
| Provine High School - Replacement of 26 year old heating, ventilation and air conditioning system (HVAC) in order to improve energy efficiency to comply with Energy Star Rating and to improve indoor air quality. |
Jackson |
MS |
15 |
$4,200,000 |
Schools |
6 |
| 18 Fixed Route Buses |
Jackson |
MS |
10 |
$6,120,000 |
Transit |
-2 |
| AVL Bus Tracking System |
Jackson |
MS |
25 |
$2,000,000 |
Transit |
-2 |
| Ridgewood Rd & Old Canton Rd Signal
Improvements |
Jackson |
MS |
35 |
$1,500,000 |
Transit |
-1 |
| Terry Rd Corridor ITS/Signal Modernization |
Jackson |
MS |
35 |
$1,500,000 |
Transit |
2 |
| Fondren Area Improvements Phase 2
Traffic Signal Modernization |
Jackson |
MS |
35 |
$825,000 |
Transit |
5 |
| Jatran Shelter Improvements |
Jackson |
MS |
30 |
$800,000 |
Transit |
-6 |
| Northside Dr Signal Improvements |
Jackson |
MS |
20 |
$750,000 |
Transit |
-1 |
| Beasley Rd Signal Improvements |
Jackson |
MS |
35 |
$750,000 |
Transit |
2 |
| 12 Demand Response Buses |
Jackson |
MS |
5 |
$720,000 |
Transit |
-6 |
| Bailey Ave Traffic Signal Improvements |
Jackson |
MS |
35 |
$650,000 |
Transit |
-1 |
| Medgar Evers Blvd Traffic Signal
Improvements |
Jackson |
MS |
20 |
$600,000 |
Transit |
1 |
| McDowell Rd Traffic Signal Improvements |
Jackson |
MS |
25 |
$550,000 |
Transit |
6 |
| CBD Traffic Signal and Curb Ramp
Modernization |
Jackson |
MS |
30 |
$450,000 |
Transit |
-2 |
| Security cameras for buses |
Jackson |
MS |
1 |
$150,000 |
Transit |
0 |