| Arterial, Collector, Residential Overlays |
Mesa |
AZ |
0 |
$20,000,000 |
Streets/Roads |
-27 |
| Power Road: Phase III, Santan Freeway to Pecos Road |
Mesa |
AZ |
0 |
$19,000,000 |
Streets/Roads |
27 |
| Ray Road: Sossaman Road to Ellsworth Road |
Mesa |
AZ |
0 |
$18,500,000 |
Streets/Roads |
5 |
| Mesa Drive: Southern Avenue to US-60 (Superstition Fwy) |
Mesa |
AZ |
0 |
$18,000,000 |
Streets/Roads |
-34 |
| Broadway Road, Sossaman Road to Hawes Road |
Mesa |
AZ |
0 |
$14,300,000 |
Streets/Roads |
-9 |
| ASU Polytechnic Ring Road located at Phoenix-Mesa Gateway Airport |
Mesa |
AZ |
0 |
$13,500,000 |
Streets/Roads |
8 |
| Gilbert Road and University Drive Intersection |
Mesa |
AZ |
0 |
$12,000,000 |
Streets/Roads |
-10 |
| Dobson Road and University Drive Intersection |
Mesa |
AZ |
0 |
$6,500,000 |
Streets/Roads |
-5 |
| Greenfield Rd: Baseline Road to Southern Avenue |
Mesa |
AZ |
0 |
$6,500,000 |
Streets/Roads |
-4 |
| Dobson Road and Guadalupe Road Intersection |
Mesa |
AZ |
0 |
$5,500,000 |
Streets/Roads |
-9 |
| Hawes Road: Santan Fwy to Ray Road |
Mesa |
AZ |
0 |
$3,800,000 |
Streets/Roads |
0 |
| East Loop ITS Device Deployment (Red Mountain Freeway and US 60) |
Mesa |
AZ |
0 |
$3,000,000 |
Streets/Roads |
-6 |
| Country Club Drive ITS Improvements |
Mesa |
AZ |
0 |
$2,509,640 |
Streets/Roads |
-4 |
| Fiber Optic Lines - Signal System for US 60 Connectivity, Phase 4B |
Mesa |
AZ |
0 |
$2,500,000 |
Streets/Roads |
2 |
| Santan Freeway ITS Fiber Backbone, US 60 to Power Road |
Mesa |
AZ |
0 |
$2,000,000 |
Streets/Roads |
7 |
| Water and Wastewater Improvements on ASU Polytechnic Campus (Phase II and III) |
Mesa |
AZ |
0 |
$14,700,000 |
Water |
6 |
| Raw Waterline from CAP Canal to South CAP Water Treatment Plant |
Mesa |
AZ |
0 |
$10,034,200 |
Water |
5 |
| Sunland Springs, Siphon Draw Flood Control Improvements |
Mesa |
AZ |
0 |
$8,230,520 |
Water |
-1 |
| Various Storm Sewer Improvements |
Mesa |
AZ |
0 |
$8,000,000 |
Water |
-3 |
| Replacement of Aging Residential Water Lines |
Mesa |
AZ |
0 |
$6,614,000 |
Water |
16 |
| Southeast Water Reclamation Plant Improvements |
Mesa |
AZ |
0 |
$6,500,000 |
Water |
6 |
| Water and Wastewater Lines on Warner Road; Power to Ellsworth Road |
Mesa |
AZ |
0 |
$5,688,000 |
Water |
1 |
| Drilling and Equipping New Well Sites |
Mesa |
AZ |
0 |
$4,200,000 |
Water |
9 |
| Rehabilitate Wastewater Crossings under US 60 |
Mesa |
AZ |
0 |
$4,000,000 |
Water |
0 |
| Water Line and Gas Line Replacement on Broadway Road; Country Club to Gilbert Road |
Mesa |
AZ |
0 |
$3,675,000 |
Water |
2 |
| Sewer Line on Rittenhouse Road; Power Road to East Mesa Interceptor |
Mesa |
AZ |
0 |
$3,220,000 |
Water |
1 |
| Replacement of Water Lines in Desert Sands Subdivision |
Mesa |
AZ |
0 |
$3,029,600 |
Water |
2 |
| New Sewer Sulfide Stations |
Mesa |
AZ |
0 |
$3,000,000 |
Water |
-2 |
| Water Line on Hawes Road: Elliot Road to Ray Road |
Mesa |
AZ |
0 |
$3,000,000 |
Water |
-2 |
| Water Line on Signal Butte; Elliot Road to Ray Road |
Mesa |
AZ |
0 |
$3,000,000 |
Water |
-1 |
| Improvements to Water Pump Stations |
Mesa |
AZ |
0 |
$2,800,000 |
Water |
-1 |
| Northwest Water Reclamation Plant Improvements |
Mesa |
AZ |
0 |
$2,700,000 |
Water |
-1 |
| Water Line on Pecos Road; Signal Butte to Ellsworth Road |
Mesa |
AZ |
0 |
$2,356,480 |
Water |
0 |
| Flow Diversion Structure for Northwest Reclamation Plant |
Mesa |
AZ |
0 |
$2,300,000 |
Water |
-1 |
| Equipping Well Sites |
Mesa |
AZ |
0 |
$2,100,000 |
Water |
-2 |
| Water Line on Ellsworth Road; Ray to Pecos Road |
Mesa |
AZ |
0 |
$1,750,000 |
Water |
-2 |
| Water Line on Signal Butte; Ray Road to Pecos Road |
Mesa |
AZ |
0 |
$1,700,000 |
Water |
-2 |
| North CAP Water Treatment Plant Improvements |
Mesa |
AZ |
0 |
$1,500,000 |
Water |
1 |
| Water Line on Elliot Road; Sossaman Road to Hawes Road |
Mesa |
AZ |
0 |
$1,500,000 |
Water |
0 |
| Sewer Line on Gateway Avenue; Crismon to Signal Butte |
Mesa |
AZ |
0 |
$1,400,000 |
Water |
0 |
| Apache Country Club Estates Water Line Replacement |
Mesa |
AZ |
0 |
$1,351,000 |
Water |
-2 |
| Diversion Structures at Baseline/Ellsworth and Broadway/56th Street |
Mesa |
AZ |
0 |
$1,300,000 |
Water |
-2 |
| Various Wastewater Manhole Rehabilitation |
Mesa |
AZ |
0 |
$1,300,000 |
Water |
-2 |
| Upgrade Electrical Equipment at Well Sites |
Mesa |
AZ |
0 |
$1,200,000 |
Water |
-2 |
| Water Line on Sossaman Road; 1/2 mile N. of Elliot Road to Ray Road |
Mesa |
AZ |
0 |
$1,100,000 |
Water |
1 |
| Falcon Field Water Zone Pump Station #6 |
Mesa |
AZ |
0 |
$1,000,000 |
Water |
1 |
| Water Line on Elliot Road; Power Road to Sossaman Road |
Mesa |
AZ |
0 |
$1,000,000 |
Water |
2 |
| Water Line on Sossaman Road, 1/2 mile N. of Willamsfield Road to Pecos Road |
Mesa |
AZ |
0 |
$1,000,000 |
Water |
1 |
| Security Improvements at Desert Well #11 |
Mesa |
AZ |
0 |
$561,423 |
Water |
-5 |
| Phx-Mesa Gateway Airport
Construct Taxiway L |
Mesa |
AZ |
0 |
$9,023,000 |
Airport |
0 |
| Phx-Mesa Gateway Airport
Construct Taxiway B from L to N |
Mesa |
AZ |
0 |
$9,000,000 |
Airport |
-3 |
| Phx-Mesa Gateway Airport
Construct Alpha Apron |
Mesa |
AZ |
0 |
$6,000,000 |
Airport |
3 |
| Falcon Field Airport
TWY F Construction (Phase 1) |
Mesa |
AZ |
0 |
$5,000,000 |
Airport |
-1 |
| Falcon Field Airport
TWY F Construction (Phase 2) |
Mesa |
AZ |
0 |
$5,000,000 |
Airport |
-3 |
| Phx-Mesa Gateway Airport
Construct Airfield/Apron Drainage |
Mesa |
AZ |
0 |
$3,800,000 |
Airport |
2 |
| Falcon Field Airport
East Side Aeronautical Use Taxiway |
Mesa |
AZ |
0 |
$2,500,000 |
Airport |
-8 |
| Falcon Field 4R Run-up Area |
Mesa |
AZ |
0 |
$1,500,000 |
Airport |
2 |
| Falcon Field Airport
Anzio Ramp Expansion |
Mesa |
AZ |
0 |
$1,500,000 |
Airport |
-6 |
| Falcon Field Airport
Taxiway B Reconfiguration & Install Runway Guard Lights (Phase 1) |
Mesa |
AZ |
0 |
$1,500,000 |
Airport |
-3 |
| Falcon Field Airport
Taxiway B Reconfiguration & Install Runway Guard Lights (Phase 2) |
Mesa |
AZ |
0 |
$1,500,000 |
Airport |
-5 |
| Falcon Field Airport
High-Speed Runway Exits for RWY 4L-22R |
Mesa |
AZ |
0 |
$788,000 |
Airport |
-2 |
| Falcon Field Airport
Falcon Field Airfield Storm Drainage System |
Mesa |
AZ |
0 |
$600,000 |
Airport |
-3 |
| Falcon Field Airport
RWY/TWY Pavement Preservation |
Mesa |
AZ |
0 |
$530,000 |
Airport |
3 |
| Falcon Field Airport
Blast Pads - RWY 4L-22R |
Mesa |
AZ |
0 |
$525,000 |
Airport |
1 |
| Falcon Field Airport
Northwest Quadrant Access Roads |
Mesa |
AZ |
0 |
$400,000 |
Airport |
-5 |
| Falcon Field Airport
RWY 4R-22L PAPI/REIL Upgrades |
Mesa |
AZ |
0 |
$325,000 |
Airport |
1 |
| Falcon Field Airport
East Ramp Reconfiguration |
Mesa |
AZ |
0 |
$300,000 |
Airport |
-3 |
| Falcon Field Airport
Automated Weather Observing System |
Mesa |
AZ |
0 |
$250,000 |
Airport |
8 |
| Falcon Field Airport
TWY F Construction |
Mesa |
AZ |
0 |
$250,000 |
Airport |
-4 |
| Falcon Field Airport
Higley Ramp Reconstruction |
Mesa |
AZ |
0 |
$180,000 |
Airport |
2 |
| Falcon Field Airport
Anzio Ramp Expansion |
Mesa |
AZ |
0 |
$150,000 |
Airport |
-4 |
| Falcon Field Airport
Taxiway B Reconfiguration & Install Runway Guard Lights |
Mesa |
AZ |
0 |
$150,000 |
Airport |
1 |
| Falcon Field Airport
Environmental Assessment for TWY F construction |
Mesa |
AZ |
0 |
$100,000 |
Airport |
-4 |
| Falcon Field Airport
High-Speed Runway Exits for RWY 4L-22R |
Mesa |
AZ |
0 |
$75,000 |
Airport |
-2 |
| Gas Gate Station #3 and 8" High Pressure Gas Main on Power Road; Pecos Road to Baseline Road |
Mesa |
AZ |
0 |
$3,356,000 |
Energy |
2 |
| Gas Main and Water Service Replacement in Quarter Section 21C Neighborhood |
Mesa |
AZ |
0 |
$3,000,000 |
Energy |
-3 |
| SCADA System for Natural Gas Distribution System |
Mesa |
AZ |
0 |
$400,000 |
Energy |
3 |
| Fire Station #215 (Phoenix-Mesa Gateway) |
Mesa |
AZ |
0 |
$7,900,000 |
Public Safety |
16 |
| Fire Station #219 |
Mesa |
AZ |
0 |
$4,400,000 |
Public Safety |
15 |
| Fire Station #318 |
Mesa |
AZ |
0 |
$4,400,000 |
Public Safety |
15 |
| Security Site Hardening at Various City Buildings |
Mesa |
AZ |
0 |
$400,000 |
Public Safety |
-9 |
| Central Mesa - Light Rail 3.5 miles of construction and utility relocations extending LRT through downtown Mesa to Horne Avenue |
Mesa |
AZ |
0 |
$290,000,000 |
Transit |
-102 |
| Central Phoenix/East Valley LRT - Park-and-Ride Expansion |
Mesa |
AZ |
0 |
$60,000,000 |
Transit |
-7 |
| Central Phoenix/East Valley LRT - Park-and-Ride Shade Canopies |
Mesa |
AZ |
0 |
$20,000,000 |
Transit |
-8 |
| Central Phoenix/East Valley LRT - System Enhancements |
Mesa |
AZ |
0 |
$20,000,000 |
Transit |
-2 |
| Park and Ride; Gilbert Road and Red Mountain Freeway (Loop 202) |
Mesa |
AZ |
0 |
$2,500,000 |
Transit |
-2 |
| Downtown Circulator Fleet Replacement |
Mesa |
AZ |
0 |
$2,000,000 |
Transit |
-9 |
| Park and Ride; Power Road and Red Mountain Freeway (Loop 202) |
Mesa |
AZ |
0 |
$1,700,000 |
Transit |
3 |