WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Modesto, California

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Modesto is $420,847,371

Description City State Jobs Cost Program Type Vote Ratio
Pelandale Avenue/State Route 99 Interchange Reconstruction Modesto CA 100 $50,000,000 Streets/Roads 21
2009 Arterial Street Overlay Project Modesto CA 500 $47,000,000 Streets/Roads 12
2009 Collector Street Overlay Project Modesto CA 500 $47,000,000 Streets/Roads 7
2009 Cape & Slurry Seal Project Modesto CA 500 $35,000,000 Streets/Roads -1
ADA Curb Ramps Modesto CA 100 $33,000,000 Streets/Roads -21
MID Lateral Paths - Construct 34 Miles of Bike and Pedestrian Trails Along Irrigation Canals Modesto CA 20 $18,700,000 Streets/Roads -29
2009 Street Rehab and Reconstruction Modesto CA 25 $10,000,000 Streets/Roads 16
Virginia Corridor Construction - Construct 2.2 Miles of Pedestrian and Bike Lanes Modesto CA 25 $10,000,000 Streets/Roads -22
Tuolumne Boulevard Extension - Construct a 2 Lane Access Road to Tuolumne River Regional Park Modesto CA 20 $5,000,000 Streets/Roads -14
Pelandale Avenue Class I Bike Path - Construct 8 Miles of Bike Path Along the Pelandale Expressway Modesto CA 10 $4,500,000 Streets/Roads -21
Trail Connection/TRRP Gateway-Legion Park - Construct 1.5 Miles of Bike Trails Modesto CA 25 $3,000,000 Streets/Roads -16
Class II Bike Lanes - Construct 64 Miles of Class II Bike Lanes City Wide Modesto CA 10 $2,000,000 Streets/Roads -5
Hetch Hetchy Trail - Construct 3 Miles of Bike Trails Along Hetch Hetchy Transmission Lines Modesto CA 10 $1,700,000 Streets/Roads -18
Dry Creek Trail Erosion Repair Modesto CA 6 $1,000,000 Streets/Roads -8
Park Irrigation System Replacement Modesto CA 5 $600,000 Streets/Roads -6
Play Equipment Replacement Modesto CA 6 $600,000 Streets/Roads -14
Modesto Centre Plaza Roofing Upgrade Modesto CA 5 $200,000 Streets/Roads -14
Mancini Bowl - Replace Aluminum Benches Modesto CA 5 $100,000 Streets/Roads -29
Primary Outfall Rehabilitation Modesto CA 40 $23,200,000 Water 2
Phase 1A Wastewater Treatment Plant - Increase Wastewater Capacity by up to 2.5 Million Gallons Per Day Modesto CA 60 $20,000,000 Water 14
Downstream Improvements - Virginia Corridor - Install New Water Transmission Pipes Modesto CA 20 $11,000,000 Water 2
Emerald Trunk Rehabilitation - Repair a 50 Year Old Main Sewer Trunk Modesto CA 30 $9,600,000 Water 8
9th Street Storm Drain Rehabilitation - Add a New Storm Drain Pipe Modesto CA 20 $7,000,000 Water 2
Downstream Improvements -Yosemite Transmission Line - Install 3 Miles of New Water Transmission Pipe Modesto CA 20 $7,000,000 Water 4
Sutter Avenue Bypass Rehabilitation Modesto CA 20 $4,500,000 Water -5
Downstream Improvements-Pressure Reduction Valves Modesto CA 10 $4,000,000 Water -4
El Rio Sewer Replacement - Relocate a Sewer Main Away from a Riparian Corridor Modesto CA 10 $2,000,000 Water -2
Mildred Perkins Water Well Modesto CA 15 $2,000,000 Water -4
Replace Well #226 Modesto CA 15 $2,000,000 Water 3
Scenic Lift Station Improvements Modesto CA 15 $2,000,000 Water -3
Waterford Water Well Modesto CA 15 $2,000,000 Water 1
State Route 132 Replace Waterline Modesto CA 20 $2,000,000 Water 8
Emergency Generators - Install Backup Generators at Water Well and Tank Sites Modesto CA 10 $1,000,000 Water 10
Gaseous Chlorine Conversion Modesto CA 10 $1,000,000 Water -10
Jennings Road Grout Stabilization Modesto CA 10 $1,000,000 Water -7
Shackelford Crossing - Rehabilitate an Existing Sewer Crossing Over the Tuolumne River Modesto CA 10 $1,000,000 Water -1
Strengthen & Replace Waterlines Modesto CA 10 $1,000,000 Water 3
Wellhead Treatment - Salida Modesto CA 10 $1,000,000 Water -4
Kansas-Needham Soil Remediation Modesto CA 15 $1,000,000 Water -13
Water Quality Laboratory Remodel Modesto CA 20 $1,000,000 Water -2
Annual Sewer Rehabilitation Modesto CA 10 $800,000 Water -4
Ellison Sewer Rehabilitation - Replace a Collapsed Sewer Main Modesto CA 10 $300,000 Water 4
Tank Safety Fall Protection Modesto CA 3 $100,000 Water -4
Airport Irrigation Well Modesto CA 5 $100,000 Water -4
Terminal Complex - Design (Initial 2010) Modesto CA 20 $1,578,950 Airport -16
Apron Rehabilitation (Westside) - Prevent Damage to Aircrafts Modesto CA 20 $400,000 Airport -10
Enhance Runway Safety Area (Rwy 10R) - Construct New Taxiway Modesto CA 20 $400,000 Airport -4
Environmental Assessment - Terminal Project Modesto CA 10 $368,421 Airport -16
Construct a Second Train Track - Modesto Amtrak Station Modesto CA 20 $2,000,000 Amtrak 19
Modesto Airport Neighborhood Empire St Modesto CA 10 $400,000 CDBG -11
Neighborhood Revitalization Related Construction - Construct a Small Community Center Modesto CA 15 $300,000 CDBG -14
Weed and Seed Construction - Construct a Small Community Center Modesto CA 15 $300,000 CDBG -19
Solar Roofs on City Government Buildings -install solar roofs on 6 City buildings to provide power to those buildings. Modesto CA 100 $5,000,000 Energy 20
500 kw Solar Roof on Corporation Yard Building -install 500 kw Solar roof on City Corporation Yard building to power operations at maintenance and transportation facilities Modesto CA 100 $2,500,000 Energy 6
Partnership for Residential Solar Retrofits -install 5kw solar systems on 100 low income and Habitat for Humanity residences Modesto CA 100 $2,000,000 Energy -18
50 kw Solar Shade Structures on 3 City Parking Garages -install 50 kw shade structure on each of 3 City pkg garages to power City/County bldg &ot her downtown public buildings & plug-ins for electric vehicles Modesto CA 50 $1,500,000 Energy 6
100 kw Solar Array at Modesto Composting -install a 100kw solar array at Modesto Composting to power equipment and maintenance facilities Modesto CA 20 $700,000 Energy 7
Energy Retrofits of Government Buildings, VFD -install VFD on HVAC units in City buildings to reduce energy use Modesto CA 20 $500,000 Energy 2
5kw Solar Shade Structures in 5 City Parks -install 5kw Solar shade structures in 5 City parks to provide green power to tennis courts, other lighting fixtures, irrigation systems, etc Modesto CA 10 $200,000 Energy -9
Energy Efficient, Green Classroom Retrofit retrofit existing modular at Modesto Composting for use in Resource Conservation Education program Modesto CA 10 $200,000 Energy -11
Public Housing Modernization Modesto CA 30 $7,500,000 Housing -33
Additional Sworn Police Officer Staffing/Hiring Grant Modesto CA 45 $4,500,000 Public Safety 36
DNA Evidence Collection, Processing, and Analysis - Process DNA Evidence for Unsolved Crimes Modesto CA 5 $1,500,000 Public Safety 5
Bus Maintenance Facility Design & Construction Modesto CA 40 $8,000,000 Transit -13
Purchase 7 New Buses Modesto CA 10 $3,000,000 Transit -7
Bus Rehabilitation Modesto CA 10 $500,000 Transit -4
Bus Stop Improvements - Add Shelters and Pavement. Modesto CA 20 $500,000 Transit -8