| Resurfacing 34 miles of road on the select street system with rubberized asphalt. |
Pasadena |
CA |
265 |
$15,600,000 |
Streets/Roads |
-16 |
| Construction of extension of Kinneloa Avenue from Colorado Blvd. to Foothill Ave. and the extension of Walnut Street. 4,000 tires to be recycled through the use of 1,600 tons of rubberized asphalt. Approximately 60 new street trees will be planted. |
Pasadena |
CA |
88 |
$5,200,000 |
Streets/Roads |
-18 |
| Construction of street improvements on Walnut St. 4,500 tires to be recycled through the use of 1,800 tons of rubberized asphalt. Approximately 23 new street trees will be planted. Traffic signals will utilize LED indicators. |
Pasadena |
CA |
44 |
$2,600,000 |
Streets/Roads |
-9 |
| Replacement of incandescent traffic signal indicators with light-emitting diode (LED) indicators. |
Pasadena |
CA |
40 |
$2,400,000 |
Streets/Roads |
-4 |
| Roadway improvements at Hahamongna Watershed Park for safety purposes including resurfacing, striping and slurry sealing, widening, and repairs to guard railing. |
Pasadena |
CA |
27 |
$1,600,000 |
Streets/Roads |
-12 |
| Battery back-up for traffic signal intersections city-wide. |
Pasadena |
CA |
7 |
$450,000 |
Streets/Roads |
-5 |
| Installation of a traffic signal at Chester and Cordova Traffic signals will utilize LED indicators. |
Pasadena |
CA |
5 |
$278,000 |
Streets/Roads |
-5 |
| Installation of a traffic signal at Foothill and PCC/Ice Rink Driveway. Traffic signals will utilize LED indicators. |
Pasadena |
CA |
4 |
$230,000 |
Streets/Roads |
-5 |
| Installation of a traffic signal at Fair Oaks and Fillmore. Traffic signals will utilize LED indicators. |
Pasadena |
CA |
3 |
$200,000 |
Streets/Roads |
-6 |
| Installation of a traffic signal at Mountain and City Yards. Traffic signals will utilize LED indicators. |
Pasadena |
CA |
3 |
$200,000 |
Streets/Roads |
-5 |
| Installation of residential street lighting on Carmelo from Villa to Lambert. |
Pasadena |
CA |
3 |
$171,000 |
Streets/Roads |
-2 |
| Installation of residential street lighting on Del Rey from Woodlyn to Washington. |
Pasadena |
CA |
2 |
$147,000 |
Streets/Roads |
-4 |
| Installation of residential street lighting on Daisy from Villa to Del Vina. LED lighting. |
Pasadena |
CA |
1 |
$86,000 |
Streets/Roads |
-3 |
| Installation of residential street lighting on Lakewood Place. LED lighting. |
Pasadena |
CA |
1 |
$74,000 |
Streets/Roads |
-3 |
| Installation of residential street lighting on Morningside from Daisy to Eastern. |
Pasadena |
CA |
1 |
$50,000 |
Streets/Roads |
-4 |
| Eastside Well Collector Pipleine-Phase 2: Increased reliability of water supply |
Pasadena |
CA |
100 |
$6,100,000 |
Water |
1 |
| Eastside Well Collector Pipleine-Phase 1: Increased reliability of water supply. |
Pasadena |
CA |
78 |
$4,600,000 |
Water |
1 |
| Jones Booster Pump electrical upgrades. Will improve energy efficiency in pumping equipment. |
Pasadena |
CA |
20 |
$1,200,000 |
Water |
1 |
| Glorietta Booster Pump electrical upgrades. Will improve energy efficiency in pumping equipment. |
Pasadena |
CA |
20 |
$1,100,000 |
Water |
1 |
| Rehabilitation of the Arroyo Parkway storm drain from Del Mar Ave. to Fillmore St. |
Pasadena |
CA |
10 |
$600,000 |
Water |
0 |
| Sewer capacity upgrades through the replacement or relief of existing sewer pipes that are hydraulically deficient. |
Pasadena |
CA |
10 |
$600,000 |
Water |
1 |
| Villa Well Electrical Upgrades. Project is already udnerway. |
Pasadena |
CA |
9 |
$520,000 |
Water |
0 |
| Garfield Well Electrical Upgrades. Contract award pending, clearer communication resulting in reduced unnecessary trips and improved efficiency. |
Pasadena |
CA |
5 |
$280,000 |
Water |
-1 |
| Robinson Park Community Building and Gymnasium. Silver LEED rating. |
Pasadena |
CA |
255 |
$15,000,000 |
CDBG |
-21 |
| Replacement of athletic field lighting at Brookside, Victory, Villa and Jefferson Park fields. Will use the most energy efficient lighting available. |
Pasadena |
CA |
51 |
$3,000,000 |
CDBG |
-8 |
| Replacement of the playgrounds at Sunnyslope and San Rafael Parks. Will use recyclable materials and wood chips as available. |
Pasadena |
CA |
8 |
$500,000 |
CDBG |
11 |
| Install new substation at Chester. |
Pasadena |
CA |
51 |
$3,000,000 |
Energy |
-3 |
| Repairs and upgrades to the following seven libraries to increase energy efficiency. Cool roof will result in decreased energy usage. |
Pasadena |
CA |
22 |
$1,300,000 |
Energy |
1 |
| Replacement of the median island irrigation on Sierra Madre Blvd. Installation of the most energy efficient irrigations systems available and drought tolerant plants. |
Pasadena |
CA |
22 |
$1,300,000 |
Energy |
-4 |
| Installation of Solar Photovoltaic systems on the roofs of the Gas Compressor Building and Pump Shop located at Pasadena's Broadway Power Plant. |
Pasadena |
CA |
15 |
$900,000 |
Energy |
-1 |
| Installation of microturbine/generator to an existing high pressure water line at the Millard Pressure Reducing Station. Renewable energy. generation |
Pasadena |
CA |
6 |
$355,000 |
Energy |
49 |
| Replace HVAC system, plumbing and gutter system and repair the roof at the Building Maintenance Building at the City Yards. |
Pasadena |
CA |
5 |
$282,000 |
Energy |
-1 |
| Storm Water Capture at Power Plants: Capture, store, treat and use rain water from City's two major storm drains. Treated rain water will be used to supplement make-up water for cooling towers and reduce equivalent amount of potable water currently used. |
Pasadena |
CA |
4 |
$250,000 |
Energy |
7 |
| Installation of an energy efficient cool roof at Fire Station 39. |
Pasadena |
CA |
2 |
$115,000 |
Energy |
-3 |
| Install new energy efficient HVAC automation system at the Police DepartmentÂ’s firing range. |
Pasadena |
CA |
1 |
$50,000 |
Energy |
-6 |
| Earthquake repairs to Fire Station 33. |
Pasadena |
CA |
71 |
$4,275,000 |
Public Safety |
-3 |
| Replacement or installation of security lights at the 13 City parks. Will use the most energy efficient lighting available. |
Pasadena |
CA |
63 |
$3,750,000 |
Public Safety |
0 |
| Seismic retrofit of the Public Works Building at the City Yards. Silver LEED rating. |
Pasadena |
CA |
58 |
$3,400,000 |
Public Safety |
-1 |
| Radio Replacement Project: Design and replace infrastructure and hand-held radios for field operations staff. |
Pasadena |
CA |
0 |
$2,500,000 |
Public Safety |
-5 |
| Seismic Upgrade: Retrofit all power facilities to withstand major earthquakes. |
Pasadena |
CA |
25 |
$1,500,000 |
Public Safety |
3 |
| Earthquake repairs to Fire Station 39. |
Pasadena |
CA |
20 |
$1,275,000 |
Public Safety |
-2 |
| Installation of exhaust ventilation systems at the following eight fire stations: #31, 32, 33, 34, 36, 37, 38 and 39. |
Pasadena |
CA |
9 |
$536,320 |
Public Safety |
1 |
| Security Upgrade: Install block wall at Goodrich Substation. |
Pasadena |
CA |
9 |
$500,000 |
Public Safety |
-5 |
| Security Upgrade: Install new block wall at Santa Anita Substation to meet new standards for Walnut street. |
Pasadena |
CA |
3 |
$150,000 |
Public Safety |
-6 |
| Installation of new playgrounds and facility improvements for school/park sites at Cleveland Elementary School and Marshall Fundamental School. Will integrate recycled plastic and rubber for play equipment. |
Pasadena |
CA |
8 |
$500,000 |
Schools |
3 |