| Mercer Corridor East - Widens Mercer Street between I-5 and Dexter Ave North to accommodate three lanes of travel in each direction, parking, sidewalks and a median with left-turn lanes. Provides a more direct route, improves access to jobs in the surroun |
Seattle |
WA |
2240 |
$50,000,000 |
Streets/Roads |
7 |
| Spokane Street Viaduct – Widens the viaduct and builds a two-lane loop off-ramp to improve freight mobility and provide a grade-separated route connecting I-5, SR 99, SR 519 and I-90 with container terminals. Extends existing bus-only lane. |
Seattle |
WA |
2240 |
$25,000,000 |
Streets/Roads |
8 |
| E Marginal Way Grade Separation - provides a roadway/rail grade separation allowing freight traffic and other vehicles to pass over rail lines which better connects port terminals, rail yards, warehousing and manufacturers. |
Seattle |
WA |
560 |
$16,000,000 |
Streets/Roads |
-3 |
| Aurora Avenue N from 137th to 145th St – widens Aurora Avenue, a key commercial corridor, to support economic growth, improve safety and mobility, and enhance pedestrian facilities. Includes transit lane. |
Seattle |
WA |
280 |
$4,000,000 |
Streets/Roads |
-8 |
| NE Northgate Way – Intersection improvements that reduce travel times, improve freight movement and increase access to major commercial, health care and higher education employers in the area. |
Seattle |
WA |
270 |
$1,000,000 |
Streets/Roads |
-7 |
| Greenwood Ave N - Widens the roadway from four-lanes to five-lanes with parallel parking, curb, gutter, and sidewalks on both sides from N 105th to N 112th. Improves transit speed and reliability and increases safety for all modes. |
Seattle |
WA |
30 |
$600,000 |
Streets/Roads |
-11 |
| Madison Valley Long Term Solution – Construction of stormwater detention system to eliminate surface flooding and sewer system backups. |
Seattle |
WA |
50 |
$43,000,000 |
Water |
1 |
| Construction of Generator Station and Buried Feeder line for emergency pumping at main water source for city. |
Seattle |
WA |
26 |
$6,270,000 |
Water |
-2 |
| Norfolk Basin Water Quality Project – Reduce pollutant loading to Duwamish River |
Seattle |
WA |
36 |
$2,510,000 |
Water |
17 |
| Point Sewer Pipe Rehabilitation – Rehabilitation of sewer pipe at localized locations within the wastewater system based. |
Seattle |
WA |
15 |
$1,740,000 |
Water |
2 |
| Georgetown Flume Drainage Improvement - Construction of new drainage conveyance system to replace existing |
Seattle |
WA |
24 |
$1,380,000 |
Water |
-1 |
| NE 107th and 17th Culvert Replacement – Replace culvert within Thornton Creek damaged by 2007 storms. |
Seattle |
WA |
12 |
$700,000 |
Water |
12 |
| Repair the main side sewer at Fire Station #40 |
Seattle |
WA |
1.5 |
$200,000 |
Water |
-5 |
| Re-pipe hot and cold domestic water lines at the Charles Street Engineering Building. |
Seattle |
WA |
1.5 |
$200,000 |
Water |
-29 |
| Replace galvanized piping at Fire Station #34 |
Seattle |
WA |
1.5 |
$200,000 |
Water |
-10 |
| Upgrade fire station drainage systems to divert fire apparatus washwater from storm sewer system. |
Seattle |
WA |
1.6 |
$200,000 |
Water |
-12 |
| Repair the sewer main under the Ballard/Northwest Senior Center. |
Seattle |
WA |
0.5 |
$60,000 |
Water |
-9 |
| Replace galvanized domestic water pipe at Fire Station #18. |
Seattle |
WA |
0.25 |
$40,000 |
Water |
-8 |
| King Street Station Renovation – renovation of historic train station that serves Sound Transit commuter trains and Amtrak intercity rail into a modern, multi-modal transportation hub |
Seattle |
WA |
230 |
$4,000,000 |
Amtrak |
47 |
| Railroad Crossing Signal Improvements - Improve key railroad crossings in the Seattle Waterfront Quiet Zone to improve safety along rail corridor that serves Amtrak, Sound Transit and freight trains. |
Seattle |
WA |
50 |
$1,500,000 |
Amtrak |
36 |
| Neighborcare Health SE Seattle Dental Clinic, |
Seattle |
WA |
0 |
$2,000,000 |
CDBG |
-41 |
| United Indians of All Tribes Foundation, Teen Parent Home Major Rehabilitation |
Seattle |
WA |
0 |
$1,750,000 |
CDBG |
-83 |
| Replace aging roof at Southeast Health Clinic. |
Seattle |
WA |
6.8 |
$850,000 |
CDBG |
-16 |
| Re-zone the Heating, Ventilating, and Air Conditioning system at the Southeast Heath Community Center to provide even distribution of HVAC. |
Seattle |
WA |
3 |
$400,000 |
CDBG |
-15 |
| Seattle Chinatown International District Preservation and Development Authority, Nutrition Program Space Rehabilitation |
Seattle |
WA |
0 |
$316,000 |
CDBG |
-51 |
| Replace original aluminum single-pane with new double-pane windows at the Central Area Senior Center. |
Seattle |
WA |
2.25 |
$300,000 |
CDBG |
6 |
| Upgrade the electrical panels, branch circuits, and grounding system in the Greenwood Senior Center. |
Seattle |
WA |
1.25 |
$160,000 |
CDBG |
-3 |
| Replace the antiquated heat pumps with new, more efficient heat pumps in the Greenwood Senior Center. |
Seattle |
WA |
0.75 |
$100,000 |
CDBG |
4 |
| Goodwill Development Association, Teen Home Fire Sprinkler System |
Seattle |
WA |
0 |
$85,000 |
CDBG |
-12 |
| Repair sewer line from sidewalk to main lateral line in street at the Central Area Senior Center. |
Seattle |
WA |
0.5 |
$80,000 |
CDBG |
-3 |
| Various HVAC EE Upgrades at publicly-owned buildings |
Seattle |
WA |
130 |
$17,500,000 |
Energy |
-19 |
| Central Plant EE Upgrades at Major Institutions |
Seattle |
WA |
89 |
$12,300,000 |
Energy |
-15 |
| Lighting retrofit project for Seattle Municipal Tower. |
Seattle |
WA |
15 |
$3,500,000 |
Energy |
-28 |
| Various small scale energy efficiency projects at city owned facilities |
Seattle |
WA |
25.75 |
$3,420,000 |
Energy |
-5 |
| Energy efficiency and small scale renewable projects at Skagit Hydro Operations. |
Seattle |
WA |
22 |
$3,000,000 |
Energy |
2 |
| Replace the antiquated Heating, Ventilating, and Air Conditioning system and expand Siemens Controls at the Charles Street Vehicle Maintenance Building. |
Seattle |
WA |
16.75 |
$2,100,000 |
Energy |
-15 |
| Install photovoltaic arrays on the roof of Seattle Department of Transportation's Sign Shop. |
Seattle |
WA |
13.75 |
$1,715,520 |
Energy |
-36 |
| Woodland Park Zoo HVAC & Lighting EE Upgrades |
Seattle |
WA |
9 |
$1,250,000 |
Energy |
-4 |
| Community Solar project- 100kw solar photovoltaic system located in central/eastern Washington. |
Seattle |
WA |
8 |
$1,200,000 |
Energy |
-1 |
| Magnuson Park Renewable Energy Demonstration- Install up to 25kw of renewable energy on three comfort stations and rest rooms. |
Seattle |
WA |
8 |
$1,200,000 |
Energy |
-45 |
| Re-balance/re-engineer the Variable Air Volume (VAV) system in Airport Way Center Building Buildings. |
Seattle |
WA |
8.25 |
$1,140,000 |
Energy |
-20 |
| Energy efficiency and small scale renewable projects at Cedar Falls Hydro operations. |
Seattle |
WA |
5 |
$1,000,000 |
Energy |
-3 |
| Upgrade lighting in various departments |
Seattle |
WA |
4.25 |
$630,000 |
Energy |
-9 |
| Solar Power on Seattle City Hall |
Seattle |
WA |
7 |
$600,000 |
Energy |
-21 |
| Seattle Parks condensing boiler installation |
Seattle |
WA |
3 |
$400,000 |
Energy |
-13 |
| Retrofit lights at various Seattle parks |
Seattle |
WA |
2 |
$225,000 |
Energy |
-9 |
| Solar Hot Water at major institutions |
Seattle |
WA |
2.5 |
$161,000 |
Energy |
9 |
| Bell Tower Rehabilitation-Major system rehabilitation including water lines, ventilation system, windows, exterior coating, UFAS upgrades |
Seattle |
WA |
0 |
$4,000,000 |
Housing |
-19 |
| Ranier Vista HOPE VI-Construction of 51 LIPH units |
Seattle |
WA |
0 |
$1,500,000 |
Housing |
-6 |
| High Point HOPE VI-Construction of parks |
Seattle |
WA |
0 |
$1,000,000 |
Housing |
-20 |
| Hiring of Eleven new Police Officers in 2009. |
Seattle |
WA |
11 |
$863,709 |
Public Safety |
53 |
| Provision of Hand-held ticketing devices to Traffic Enforcement Police Officers. |
Seattle |
WA |
0 |
$412,540 |
Public Safety |
-388 |