WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

Jerry Brito talks about the new Stimulus Watch site on WUSA... 11/18/2009

Jerry Brito talks about the new Stimulus Watch site on WUSA Channel 9 News.

Help Washington Watch track congressional earmarks 07/23/2009

Stimulus Watch was inspired in part by Washington Watch, a site that lets you find, rate, describe, and discuss legislation…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Zanesville, Ohio

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Zanesville is $17,300,997

Description City State Jobs Cost Program Type Vote Ratio
State Route 93 Turn Lane This project consists of the construction of a turn lane on SR 93 that will access a new entrance into the EastPointe Business Park as part of the Master Plan for the expansion of the Job Ready Site that is estimated to add over Zanesville OH 2500 $1,244,970 Streets/Roads -8
2009 City Wide Overlays This project consists of 18 miles of road resurfacing and 5400 feet of water lines replacement. The project would create a minimum of 30 jobs associated with construction contracts to perform the work. The city has received $816 Zanesville OH 30 $590,597 Streets/Roads 8
Water Treatment Plant Upgrade: This Project consists of the construction of a new 10 MGD manganese and iron removal water treatment plant. This plant is critical to the economic and population growth of Zanesville and surrounding area as the existing pla Zanesville OH 500 $9,000,000 Water 10
The EastPointe Sanitary Expansion This project consists of the construction and installation of 2 lift stations, approximately 11,650 LF of gravity sanitary sewer and approximately 13,650 LF of sanitary force main. This project will increase the capacity Zanesville OH 500 $2,347,370 Water 5
Wayne Avenue Waterline Project This project will replace a deficient water main and provide improved fire protection along Wayne Avenue prior to a street resurfacing project. The project will consist of approximately 7200 feet of 8 inch water main Zanesville OH 30 $510,000 Water 6
CSO R-13 Sewer Separation Project This project will eliminate CSO (Combined Sewer Overflows) R-13 by separating the sanitary and storm sewers. The project has been mandated by the Ohio EPA to be a part of the City of ZanesvilleÂ’s Long Term Control Plan. Zanesville OH 25 $385,000 Water 8
Tileston Avenue Drainage Project This project will provide improved drainage and flood protection for a low to moderate income area of the City of Zanesville. The project will consist of approximately 2000 feet of 24 inch storm sewer and appurtenances. Zanesville OH 25 $260,000 Water 0
CSO R-17 & CSO R-19 Sewer Separation Project This project will eliminate CSOÂ’s (Combined Sewer Overflows) R-17 and R-19 by separating the sanitary and storm sewers. The project has been mandated by the Ohio EPA Zanesville OH 25 $227,000 Water 7
New Backwash Waste Line This Project is a separate component of the new water treatment plant. Using a crew of up to 6 full time employees, the City will construct a 12 inch backwash waste line, approximately 3500 feet long, from the water treatment plan Zanesville OH 2000 $164,000 Water 9
CSO R-21 High Water Protection Project This project will provide protection of CSO (Combined Sewer Overflow) R-21 from impacts of high water levels of the Muskingum River. The project has been mandated by the Ohio EPA to be a part of the City of Zanesvil Zanesville OH 25 $30,000 Water 6
Installation of Varmatic LightMaster Products on all city street lighting. Zanesville OH 75 $200,000 Energy -10
JRS Rail Spur Extension This project consists of the construction and installation of 11,131.51 LF of rail to service the Job Ready Site which is estimated to add over 2,000 jobs when completed and certified in December 2009. Zanesville OH 2000 $2,342,060 Transit 23