| Provide funding match to construct a segment of a new arterial connecting State Route 51. |
Alameda |
CA |
60 |
$9,000,000 |
Streets/Roads |
-185 |
| Reconstruct approximately 1.5 miles of a major collector in Harbor Bay Business Park. |
Alameda |
CA |
28 |
$5,000,000 |
Streets/Roads |
-122 |
| ADA sidewalk rehabilitation. |
Alameda |
CA |
11 |
$3,750,000 |
Streets/Roads |
-125 |
| Construct Phase 2 of the Webster Street Streetscape project, including vintage lighting and street trees. |
Alameda |
CA |
20 |
$3,000,000 |
Streets/Roads |
-157 |
| Reconstruct .35 miles of Fernside Boulevard, including drainage and sidewalk improvements. |
Alameda |
CA |
22 |
$2,011,000 |
Streets/Roads |
-62 |
| Reconstruct approximately 1 mile of Central Avenue, including drainage and sidewalk improvements. |
Alameda |
CA |
21 |
$1,880,000 |
Streets/Roads |
-46 |
| Install traffic signals at three locations. |
Alameda |
CA |
14 |
$1,250,000 |
Streets/Roads |
-86 |
| Improve drainage and resurface street, Mariner Square Drive. |
Alameda |
CA |
14 |
$1,250,000 |
Streets/Roads |
-35 |
| Install accessible signals and pedestrian countdown signals at 58 intersections. |
Alameda |
CA |
14 |
$1,235,000 |
Streets/Roads |
-34 |
| Install 8,500 linear feet of new sidewalks to fill in gaps in pedestrian corridors. |
Alameda |
CA |
17 |
$1,000,000 |
Streets/Roads |
-36 |
| Install curb bulb-outs at Grand Street and San Jose Avenue; install pedestrian curb ramps in front of Lum School; install lighted mid-block cross on Grand Street; improve three public walkways; update crossing signs. |
Alameda |
CA |
10 |
$750,000 |
Streets/Roads |
-49 |
| ADA construction improvements to 100 intersections; add truncated domes and ramps. |
Alameda |
CA |
8 |
$500,000 |
Streets/Roads |
-12 |
| Reconstruct and enhance bicycle trails. |
Alameda |
CA |
11 |
$500,000 |
Streets/Roads |
-125 |
| Plant approximately 500 new trees and remove and replace approximately 150 trees throughout the City. |
Alameda |
CA |
7 |
$300,000 |
Streets/Roads |
-126 |
| Park Street Streetscape improvements, including vintage lighting and street trees, from Lincoln Avenue to Times Way and Webb Street; and Central Avenue to San Jose Avenue. |
Alameda |
CA |
5 |
$200,000 |
Streets/Roads |
-108 |
| Replace riprap and improve outfalls for the Harbor Bay Dike and seawall to protect public access and adjacent residences. |
Alameda |
CA |
30 |
$5,000,000 |
Water |
-33 |
| Use shotcrete to improve the structural stability of the Southshore Lagoon seawalls adjacent to City public access: approximately 3,000 linear feet. |
Alameda |
CA |
19 |
$1,700,000 |
Water |
-27 |
| Install mechanical trash racks to clear debris and reduce flooding at various storm pump stations. |
Alameda |
CA |
10 |
$750,000 |
Water |
-18 |
| Restore the historic Carnegie Free Library for public use as the Community Arts/Planning and Building Center. Relocate the adjacent Foster House to accommodate a proposed addition that will connect the Foster House with the Carnegie Library and provide d |
Alameda |
CA |
50 |
$5,630,000 |
CDBG |
-186 |
| Alameda Landing Phase I: Demolition of existing improvements, relocation of utilites, and environmental remediation of future residential site (subject to CDBG blight and brown field regulations). |
Alameda |
CA |
50 |
$4,750,000 |
CDBG |
-70 |
| ADA park pathway upgrades |
Alameda |
CA |
25 |
$2,500,000 |
CDBG |
-74 |
| Fire Station 5 Rehabilitation (located in low income census tract): roof and windows replacement and walls. |
Alameda |
CA |
11 |
$1,000,000 |
CDBG |
-16 |
| Upgrade and rehabilitate building interior, including asbestos removal, painting, replacement of carpets and window coverings, and ceiling repairs at the Al DeWitt O' Club at Alameda Point (located in low income census tract). |
Alameda |
CA |
11 |
$500,000 |
CDBG |
-41 |
| Rehabilitate field - Lincoln Park. |
Alameda |
CA |
11 |
$500,000 |
CDBG |
-79 |
| Replace the fence at Lincoln Park field. |
Alameda |
CA |
11 |
$500,000 |
CDBG |
-86 |
| Resurface basketball courts at Washington, Leydecker, and McKinley parks. |
Alameda |
CA |
8 |
$375,000 |
CDBG |
-86 |
| Resurface tennis courts at Washington, Leydecker, and McKinley parks. |
Alameda |
CA |
8 |
$375,000 |
CDBG |
-93 |
| Upgrade the pathways, lighting, and landscaping at Neptune Park. |
Alameda |
CA |
8 |
$350,000 |
CDBG |
-52 |
| ADA upgrade of restroom facility and lobby at Alameda Point Gymnasium (located in low income census tract). |
Alameda |
CA |
7 |
$300,000 |
CDBG |
-36 |
| Replace the fence at Washington Park field. |
Alameda |
CA |
7 |
$300,000 |
CDBG |
-58 |
| Replace windows and trim at the Veterans Memorial Building. |
Alameda |
CA |
6 |
$250,000 |
CDBG |
-7 |
| ADA upgrades to restroom facility at Grand Street Boat ramp. |
Alameda |
CA |
6 |
$250,000 |
CDBG |
-41 |
| Replace windows and trim at City Hall. |
Alameda |
CA |
6 |
$250,000 |
CDBG |
-59 |
| ADA upgrades to restroom facility at Encincal Boat ramp. |
Alameda |
CA |
6 |
$250,000 |
CDBG |
-38 |
| Upgrade building interior and refinish 360,000 sq. ft. of gynmasium floor at Alameda Point Gym (located in low income census tract). |
Alameda |
CA |
4 |
$200,000 |
CDBG |
-50 |
| Resurfacing basketball courts in Longfellow Park (located in low income census tract). |
Alameda |
CA |
3 |
$125,000 |
CDBG |
-62 |
| Resurfacing tennis court in Longfellow Park (located in low income census tract). |
Alameda |
CA |
3 |
$125,000 |
CDBG |
-71 |
| Rehabilitate the skate board park. |
Alameda |
CA |
2 |
$100,000 |
CDBG |
-178 |
| Install solar panels on roof of the Main Library. |
Alameda |
CA |
13 |
$1,200,000 |
Energy |
-12 |
| Install solar hot water heating system to supplement the operation of a new energy efficient hot water system at Anne B. Diament. |
Alameda |
CA |
2 |
$100,000 |
Energy |
-20 |
| Replace kitchen, bath cabinets and counters in all the 186 units of the Independence Plaza. |
Alameda |
CA |
12 |
$1,320,000 |
Housing |
-194 |
| Replace siding, windows, and sliding glass doors with energy efficient glazing in all units at Anne B. Diament. |
Alameda |
CA |
13 |
$1,300,000 |
Housing |
-37 |
| Replace the interior flooring of all the Housing Authority units. |
Alameda |
CA |
12 |
$1,200,000 |
Housing |
-59 |
| Replace kitchen and bath cabinets, counters, and electrical sub panels at Esperanza. |
Alameda |
CA |
10 |
$1,000,000 |
Housing |
-67 |
| Repaint the interior of all Housing Authority units. |
Alameda |
CA |
10 |
$1,000,000 |
Housing |
-59 |
| Replace roofs and gutters on all buildings at Esperanza. |
Alameda |
CA |
10 |
$725,000 |
Housing |
-40 |
| Replace, at Independence Plaza, two ponds, remove lawn, and re-landscape with drought tolerant native plants. |
Alameda |
CA |
10 |
$500,000 |
Housing |
-66 |
| Replace asphalt parking lots (7 total) and driveways at Esperanza. |
Alameda |
CA |
8 |
$350,000 |
Housing |
-35 |
| Repair all exterior siding and trim, and restain fences and gates at Parrot Village. |
Alameda |
CA |
4 |
$200,000 |
Housing |
-34 |
| Replace the first floor kitchen and bath cabinets, including the community room at Anne B. Diament. |
Alameda |
CA |
4 |
$200,000 |
Housing |
-43 |
| Repaint all exterior siding and trim; restain fences and gates at Eagle Village. |
Alameda |
CA |
4 |
$200,000 |
Housing |
-32 |
| Construct a new 22-space parking lot at the rear of the Independence Plaza complex. |
Alameda |
CA |
5 |
$200,000 |
Housing |
-48 |
| Replace the boiler system, at Anne B. Diament, with a high-efficiency boiler for hydroponic heating system. |
Alameda |
CA |
2 |
$125,000 |
Housing |
-22 |
| Install bus shelters and related improvements at 18 locations throughout the City. |
Alameda |
CA |
6 |
$250,000 |
Transit |
-10 |
| Street Rehabilitation/Construction: Mission Road, from Garfield Avenue to the west City boundary |
Alhambra |
CA |
0 |
$2,402,080 |
Streets/Roads |
-16 |
| Street Rehabilitation/Construction: Marengo Avenue, from Alhambra Road to Ross Avenue |
Alhambra |
CA |
0 |
$2,120,150 |
Streets/Roads |
-11 |
| Street Rehabilitation/Construction: Chapel Avenue, from Woodward Avenue to Hellman Avenue |
Alhambra |
CA |
0 |
$2,000,000 |
Streets/Roads |
-9 |
| Street Rehabilitation/Construction: Glendon Way, from New Avenue to Meridian Avenue |
Alhambra |
CA |
0 |
$1,603,680 |
Streets/Roads |
-13 |
| Street Rehabilitation/Construction: Palm Avenue, from Main Street to Mission Road |
Alhambra |
CA |
0 |
$1,500,000 |
Streets/Roads |
-11 |
| Street Rehabilitation/Construction: Garvey Avenue, from Ramona Road to Atlantic Blvd. |
Alhambra |
CA |
0 |
$1,500,000 |
Streets/Roads |
-8 |
| Street Rehabilitation/Construction: Valley Blvd., from the east City boundary to Marengo Avenue |
Alhambra |
CA |
0 |
$1,500,000 |
Streets/Roads |
-7 |
| Street Rehabilitation/Construction: Poplar Avenue, from Fremont Avenue to the west City boundary |
Alhambra |
CA |
0 |
$1,000,000 |
Streets/Roads |
-6 |
| Street Rehabilitation/Construction: New Avenue, from Los Higos/north boundary to the I-10 Freeway |
Alhambra |
CA |
0 |
$1,000,000 |
Streets/Roads |
-9 |
| Street Rehabilitation/Construction: Concord Avenue, from Fremont Avenue to the west City boundary |
Alhambra |
CA |
0 |
$1,000,000 |
Streets/Roads |
-8 |
| Street Rehabilitation/Construction: Alhambra Road, from the east City boundary to the west City boundary |
Alhambra |
CA |
0 |
$1,000,000 |
Streets/Roads |
-7 |
| Street Rehabilitation/Construction: Woodward Avenue, from Bushnell Avenue to Almansor Avenue |
Alhambra |
CA |
0 |
$900,000 |
Streets/Roads |
-6 |
| Street Rehabilitation/Construction: Hellman Avenue, from the east City boundary to Almansor Street |
Alhambra |
CA |
0 |
$250,000 |
Streets/Roads |
-7 |
| Longden Well and Pumphouse Rehabilitation |
Alhambra |
CA |
0 |
$2,000,000 |
Water |
-5 |
| Garvey Reservoir Improvements - Epoxy Lining |
Alhambra |
CA |
0 |
$1,500,000 |
Water |
-3 |
| Water Main Replacement Project: On Palatine Avenue, from Waverly to Vista |
Alhambra |
CA |
0 |
$1,000,000 |
Water |
-3 |
| Water Main Replacement Project: On Warwick, from Hellman to Ramona |
Alhambra |
CA |
0 |
$500,000 |
Water |
-6 |
| Water Main Replacement Project: Westmont Drive, from Hellman to Ramona |
Alhambra |
CA |
0 |
$350,000 |
Water |
-4 |
| Water Main Replacement Project: On Winthrop Drive, from Hellman to Ramona |
Alhambra |
CA |
0 |
$350,000 |
Water |
-4 |
| Water Main Replacement Project: On Westminster Avenue, from Hellman to Ramona |
Alhambra |
CA |
0 |
$300,000 |
Water |
-5 |
| Water Main Replacement Project: On Orange Grove Avenue, from Hellman to Ramona |
Alhambra |
CA |
0 |
$300,000 |
Water |
-4 |
| Water Main Replacement Project: On Meridian (south), from Hellman to Ramona |
Alhambra |
CA |
0 |
$250,000 |
Water |
-4 |
| Water Main Replacement Project: On Avondale, from Hellman to Ramona |
Alhambra |
CA |
0 |
$250,000 |
Water |
-4 |
| Water Main Replacement Project: On La Paloma, from Hellman to Ramona |
Alhambra |
CA |
0 |
$200,000 |
Water |
-4 |
| Sewer Mainline Replacement Project: 334 linear feet on Hellman Avenue, east of Garfield Avenue |
Alhambra |
CA |
0 |
$135,270 |
Water |
-3 |
| Street Rehabilitation/Construction: Main Street, from the east City boundary to the west City boundary |
Alhambra |
CA |
0 |
$8,000,000 |
CDBG |
-25 |
| Street Rehabilitation/Construction: Commonwealth Avenue, from Granada Avenue to Winchester Avenue |
Alhambra |
CA |
0 |
$2,688,310 |
CDBG |
-8 |
| Street Rehabilitation/Construction: Raymond Avenue, from Grand Avenue to Mission Road |
Alhambra |
CA |
0 |
$900,000 |
CDBG |
-5 |
| Street Light Conversion to Multiple Light Circuits in the Airport Tract area, south of Valley Blvd. and west of New Avenue |
Alhambra |
CA |
0 |
$700,000 |
CDBG |
-10 |
| Alley Improvements in CDBG Areas |
Alhambra |
CA |
0 |
$250,000 |
CDBG |
-15 |
| LED Traffic Signal Lights - 75 locations: Change from incandescent bulbs to low emitting diodes (LED) for decreased electrical costs. |
Alhambra |
CA |
0 |
$1,000,000 |
Energy |
-13 |
| Construction of an Alternate Emergency Operations Center (EOC)/Classroom |
Alhambra |
CA |
0 |
$325,000 |
Public Safety |
-15 |
| Purchase and Installation of Digital In-Car Video Cameras for Police patrol vehicles: includes all network hardware, software, and servers to wirelessly download video from patrol vehicles onto servers. Will assist in compiling evidence in DUI and p |
Alhambra |
CA |
0 |
$175,000 |
Public Safety |
-5 |
| Roadway and Highway Infrastructure Reconstruction |
Anaheim |
CA |
1450 |
$35,000,000 |
Streets/Roads |
-21 |
| Gene Autry Way and Interstate 5 Interchange Construction Project |
Anaheim |
CA |
1740 |
$32,000,000 |
Streets/Roads |
-71 |
| Katella Ave Smart Street Roadway Construction Project |
Anaheim |
CA |
580 |
$15,000,000 |
Streets/Roads |
-34 |
| Intersection Widening Projects - La Palma Ave and Kraemer Blvd; East Street and 91 Freeway |
Anaheim |
CA |
290 |
$3,000,000 |
Streets/Roads |
-24 |
| Water System Infrastructure Construction Program |
Anaheim |
CA |
1537 |
$28,000,000 |
Water |
15 |
| Downtown Sewer Reconstruction Project |
Anaheim |
CA |
1160 |
$20,000,000 |
Water |
1 |
| Downtown Water Recycling Project |
Anaheim |
CA |
145 |
$5,000,000 |
Water |
4 |
| Thornton Brady Storm Drain Construction |
Anaheim |
CA |
87 |
$3,000,000 |
Water |
15 |
| Anaheim Convention Center Expansion Project |
Anaheim |
CA |
6000 |
$220,000,000 |
CDBG |
-706 |
| Electrical System Undergrounding |
Anaheim |
CA |
522 |
$18,000,000 |
CDBG |
-20 |
| Construction of Fire Station No. 12 and Neighborhood Park - Platinum Triangle |
Anaheim |
CA |
406 |
$14,000,000 |
CDBG |
-26 |
| Anaheim Solar Flair (Solar Panel placement on city facilities and commercial sites) |
Anaheim |
CA |
690 |
$24,000,000 |
Energy |
-53 |
| Water and Energy Efficiency Retrofitting Projects |
Anaheim |
CA |
522 |
$18,750,000 |
Energy |
10 |