| Southwest Parkway construction from Nashville Rd. to Russellville Rd. |
Bowling Green |
KY |
144 |
$20,000,000 |
Streets/Roads |
-10 |
| Shive Lane Extension |
Bowling Green |
KY |
36 |
$5,000,000 |
Streets/Roads |
-6 |
| Old Morgantown Rd. reconstruction |
Bowling Green |
KY |
29 |
$4,000,000 |
Streets/Roads |
-7 |
| Cave Mill/Smallhouse Road Re-alignment |
Bowling Green |
KY |
30 |
$4,000,000 |
Streets/Roads |
8 |
| Greenwood Lane |
Bowling Green |
KY |
10 |
$1,600,000 |
Streets/Roads |
-2 |
| Street Resurfacing |
Bowling Green |
KY |
4 |
$800,000 |
Streets/Roads |
6 |
| Relief Sewer to Pioneer Drive |
Bowling Green |
KY |
32 |
$3,200,000 |
Water |
1 |
| 2 MG South Central Tank |
Bowling Green |
KY |
38 |
$2,200,000 |
Water |
-2 |
| Replace Cast Iron Mains |
Bowling Green |
KY |
15 |
$1,000,000 |
Water |
-2 |
| Eliminate Dead End Mains |
Bowling Green |
KY |
12 |
$1,000,000 |
Water |
-6 |
| Briarwood Sewer Rehabilitation |
Bowling Green |
KY |
26 |
$1,000,000 |
Water |
5 |
| Filter Backwash replacement |
Bowling Green |
KY |
8 |
$650,000 |
Water |
-1 |
| CCTV Assessment, Sewer Basins |
Bowling Green |
KY |
10 |
$500,000 |
Water |
-7 |
| Security System Upgrade |
Bowling Green |
KY |
6 |
$500,000 |
Water |
-6 |
| Interceptor Cleaning and Video |
Bowling Green |
KY |
13 |
$500,000 |
Water |
-8 |
| Telemetry to Sewer Stations |
Bowling Green |
KY |
11 |
$500,000 |
Water |
0 |
| Jennings Creek Interceptor Rehabilitation |
Bowling Green |
KY |
9 |
$300,000 |
Water |
0 |
| Install check valves to tank |
Bowling Green |
KY |
7 |
$225,000 |
Water |
-1 |
| Overlay and Strengthen Runway 3-21 |
Bowling Green |
KY |
40 |
$2,000,000 |
Airport |
-4 |
| Commercial/Industrial Lover's Lane Development |
Bowling Green |
KY |
30 |
$1,100,000 |
Airport |
-16 |
| New Fixed Based Operator |
Bowling Green |
KY |
31 |
$875,000 |
Airport |
-14 |
| Commercial Air Service Revenue Guarantee |
Bowling Green |
KY |
15 |
$500,000 |
Airport |
-10 |
| Greenway Path construction at Kereiakes Park; Old Louisville Rd., West Campus, South Campus and Lovers Lane |
Bowling Green |
KY |
5 |
$1,045,000 |
CDBG |
-11 |
| N. Limestone Sidewalks/Bikelanes |
Bowling Green |
KY |
20 |
$500,000 |
CDBG |
-12 |
| Park Improvements |
Bowling Green |
KY |
2 |
$282,000 |
CDBG |
-11 |
| Double Springs East Sidewalk and Drainage |
Bowling Green |
KY |
1 |
$210,000 |
CDBG |
-7 |
| Data center/Network operations center at WKU Center for Research & Development (WKU center for R&D) |
Bowling Green |
KY |
50 |
$5,130,310 |
Energy |
0 |
| Energy Stimulus Efficiency Grants |
Bowling Green |
KY |
18 |
$3,000,000 |
Energy |
-2 |
| Re-conductor Circuit CM 224 & Circuit 5HI 214 |
Bowling Green |
KY |
10 |
$1,200,000 |
Energy |
-4 |
| Bowling Green, KY to Morgantown, KY Fiber connection |
Bowling Green |
KY |
14 |
$600,000 |
Energy |
0 |
| Bowling Green Primary Substation Relay Upgrade |
Bowling Green |
KY |
5 |
$500,000 |
Energy |
0 |
| City Buillding Energy Retrofit |
Bowling Green |
KY |
2 |
$500,000 |
Energy |
-5 |
| Bowling Green, KY to Franklin, KY Fiber connection |
Bowling Green |
KY |
14 |
$384,000 |
Energy |
1 |
| Upgrade street lighting along Kentucky St. from 31W Bypass to 8th St |
Bowling Green |
KY |
3 |
$211,000 |
Energy |
-2 |
| Upgrade Street Lighting along Veterans Memorial Blvd. Phases 3&4 |
Bowling Green |
KY |
3 |
$200,000 |
Energy |
-8 |
| Install Substation security cameras |
Bowling Green |
KY |
2 |
$100,000 |
Energy |
-7 |
| Install animal prevention measures at Bowling Green Primary substation |
Bowling Green |
KY |
4 |
$90,000 |
Energy |
-14 |
| Fence & gravel South Industrial poleyard |
Bowling Green |
KY |
5 |
$80,000 |
Energy |
-11 |
| Purchase and Renovate Multi-family Apartment Complex |
Bowling Green |
KY |
6 |
$5,000,000 |
Housing |
-46 |
| Capitol Improvements and Deferred Maintenance for 598 Public Housing Units |
Bowling Green |
KY |
5 |
$5,000,000 |
Housing |
-12 |
| Fort Webb Subdivision Infrastructure |
Bowling Green |
KY |
5 |
$4,000,000 |
Housing |
-24 |
| Lee Square Subdivision |
Bowling Green |
KY |
10 |
$1,100,000 |
Housing |
-15 |
| Renovating Distressed Residential Properties |
Bowling Green |
KY |
200 |
$600,000 |
Housing |
-19 |
| Police Annex/Storage Facility construction |
Bowling Green |
KY |
30 |
$3,400,000 |
Public Safety |
-24 |
| New/replacement Surveillance Equipment |
Bowling Green |
KY |
2 |
$300,000 |
Public Safety |
-12 |
| Two New Canine Units |
Bowling Green |
KY |
2 |
$250,000 |
Public Safety |
-25 |
| Dedicated Federal Prosecutor and Support |
Bowling Green |
KY |
2 |
$250,000 |
Public Safety |
-11 |
| New detective vehicles and undercover vehicles |
Bowling Green |
KY |
1 |
$200,000 |
Public Safety |
-19 |
| HVAC Work |
Bowling Green |
KY |
36 |
$1,000,000 |
Schools |
-3 |
| Asbestos Abatement |
Bowling Green |
KY |
24 |
$250,000 |
Schools |
6 |
| Improving/enhancing Safety |
Bowling Green |
KY |
24 |
$200,000 |
Schools |
1 |
| Monitoring System District Wide |
Bowling Green |
KY |
4 |
$100,000 |
Schools |
-9 |
| Bus Transfer Station |
Bowling Green |
KY |
13 |
$1,000,000 |
Transit |
-1 |
| Franklin County Interstate 64 Regional Water Supply: Construct 9 miles of 24 inch transmission main to provide regional water supplies to Frankfort, Franklin County, Shelby County and Scott County in Kentucky. |
Frankfort |
KY |
157 |
$19,600,000 |
Water |
42 |
| The City of Frankfort Holmes Street Sanitary Sewer Separation Project: Rehabilitation and Separation of combined sanitary and storm water in a low income area of the city. The Project includes the installation of 3995 LF of Storm Sewer (210’ or 36”, 460 |
Frankfort |
KY |
250 |
$10,000,000 |
Water |
25 |
| SRF Phase VII: The proposed project will involve five sewer extensions along US68/80B and US41A; include 15 new pump stations and upgrading four existing pump stations which will provide sewer service to unserved areas allowing residential and commercial |
Hopkinsville |
KY |
50 |
$21,500,000 |
Water |
8 |
| Moss Water Treatment Plant Upgrade/Expansion: The proposal is to upgrade the existing treatment and expand the capacity from 10 to 15 million gallons per day which will provide for compliance with current and future regulations and adequate capacity throu |
Hopkinsville |
KY |
50 |
$15,000,000 |
Water |
15 |
| Dry Dam: The proposed project will include the design and construction of a regional flood control facility and/or watershed lakes strategically placed to provide the necessary flood control for the South Fork of Little River. Flooding in the City of Hopk |
Hopkinsville |
KY |
75 |
$13,000,000 |
Water |
63 |
| Hopkinsville Water Main Extensions – US 68/80 Bypass: The proposal is to install water main along US68/80B which will provide water service to the currently unserved area. |
Hopkinsville |
KY |
35 |
$8,000,000 |
Water |
4 |
| SRF Phase VI: The proposed project will involve various gravity sewer rehab and replacement projects, three sewer extensions, installation of chemical feed equipment for phosphorus compliance at Northside WWTP; |
Hopkinsville |
KY |
50 |
$7,500,000 |
Water |
7 |
| US 41A Water Main Improvements: The proposal is to replace 8-inch water main along US41A with 12-inch main, construct 2 million gallon elevated storage tank and booster station, and construct an interconnect with Oak Grove |
Hopkinsville |
KY |
25 |
$6,000,000 |
Water |
9 |
| Westwood Drive Stormwater Infrastructure Improvements: The proposed project will involve storm water infrastructure improvements that will benefit a minimum of ten (10) structures that currently experience flooding of structures, yards, and streets. |
Hopkinsville |
KY |
30 |
$1,096,800 |
Water |
0 |
| Hillaire/Skyline Drive Stormwater Infrastructure Improvements: The proposed project will involve storm water infrastructure improvements that will benefit many Givens Addition area homes that currently experience flooding of crawl spaces, yards |
Hopkinsville |
KY |
30 |
$538,800 |
Water |
2 |
| The proposed project includes the establishment of the Campbell Street corridor to provide a more efficient entrance into downtown Hopkinsville. The proposal is seeking funding for the renovation of Campbell Street. |
Hopkinsville |
KY |
20 |
$15,000,000 |
CDBG |
29 |
| The City of Hopkinsville is requesting a $1,000,000 grant over the period of two (2) years to be utilized in the Inner City Residential Enterprise Zone (ICREZ) neighborhoods. The City will be partnering with the Christian County-Hopkinsville Development |
Hopkinsville |
KY |
200 |
$1,000,000 |
CDBG |
-23 |
| The proposed project is to construct a restroom facility in the Heart of Downtown Hopkinsville that will service the many amenities that are currently available. The proposed facility would be erected in close proximity to outdoor facilities |
Hopkinsville |
KY |
0 |
$200,000 |
CDBG |
-9 |
| Riverwalk Connector Walking Bridge: The City of Hopkinsville is proposing that a walking bridge be built between the existing West Side Park and walking trails located on the northern bank of the Little River and walking trails |
Hopkinsville |
KY |
15 |
$150,000 |
CDBG |
-19 |
| Hopkinsville, KY Green Power Project: Hopkinsville Electric System will install a 1 megawatt generation station on Peartree Lane in Hopkinsville. This station will help serve the electrical needs of Christian County including the Fort Campbell Post. |
Hopkinsville |
KY |
6 |
$7,800,000 |
Energy |
-5 |
| Automated Electric Information System: The City of Hopkinsville is proposing an automated electric information system. Currently, electric customers use more electricity than necessary due to lack of information about the amount of electricity being use |
Hopkinsville |
KY |
4 |
$3,900,000 |
Energy |
-34 |
| Clark Gardens (Hopkinsville Affordable Homeownership Program): The City is proposing the completion of infrastructure for the Clark Gardens Subdivision. The Clark Gardens Subdivision was created on City owned property in 2001 as a subdivision |
Hopkinsville |
KY |
30 |
$550,000 |
Housing |
-21 |
| Christian County, KY High-speed Infrastructure: Hopkinsville Electric System (HES) is prepared to build a high-speed communications network throughout Christian County. The proposed network will use a combination of fiber optic transmission lines and wir |
Hopkinsville |
KY |
11 |
$8,260,080 |
Public Safety |
-4 |
| Pardue Lane Drainage and Passive Park: The RC Owen property is located on the south side of Pardue Lane. A portion of the property is slated to be utilized to provide storm water facilities to serve the immediate area. |
Hopkinsville |
KY |
30 |
$750,000 |
Public Safety |
10 |
| Communications Center Renovations/EOC backup: The Communications Center Renovations portion of the proposed project includes improved communications systems, expanded office space to accommodate dispatch personnel, increased security measures, and updates |
Hopkinsville |
KY |
15 |
$500,000 |
Public Safety |
10 |
| Riverbank Stabilization: The Little River Stabilization Project will include the design, construction management, and construction of the necessary walls and other structures required to stabilize the east bank of the Little River |
Hopkinsville |
KY |
15 |
$350,000 |
Public Safety |
8 |
| Eagle Cove Left-Hand Turning Lanes: The City of Hopkinsville is proposing the construction of a left-hand turning lane on US68/80B Eagle Way to accommodate and provide stacking for vehicular traffic attempting to access the Eagle Cove Subdivision |
Hopkinsville |
KY |
15 |
$250,000 |
Public Safety |
-2 |
| Christian County Middle School: The City of Hopkinsville is proposing the construction of middle school to include grade 6 thru 8 for 800 students to replace the existing school built in 1959. |
Hopkinsville |
KY |
90 |
$22,600,000 |
Schools |
10 |
| Hopkinsville High School Re-roofing: The City of Hopkinsville is proposing to replace the deteriorated roof over gymnasium of an existing grade 9-12 high school. |
Hopkinsville |
KY |
9 |
$603,000 |
Schools |
10 |
| Hopkinsville Middle School Re-roofing: The City of Hopkinsville is proposing to replace section of roof over classrooms in an existing grade 6-8 middle school. |
Hopkinsville |
KY |
7 |
$520,000 |
Schools |
4 |
| Lacy Elementary Re-roofing: The City of Hopkinsville is proposing to replace last phase of deteriorated roof of Lacy Elementary School which is an existing K-5th grade elementary school. |
Hopkinsville |
KY |
5 |
$192,000 |
Schools |
2 |
| Christian County Advanced Road Development Program 2009: The proposal is to pave the existing 93 miles of gravel roads in Christian County. Christian County Kentucky is geographically the second largest county in the State of Kentucky. Fort Campbell, KY, |
Hopkinsville |
KY |
100 |
$11,250,400 |
Transit |
1 |
| Lovers Lane Expansion: The City of Hopkinsville is proposing a major widening of the existing Lovers Lane from 2 lanes to 3 lanes from US HWY 41A (Ft Campbell Blvd) on the east to the junction of Lovers Lane and the Pennyrile Parkway Extension |
Hopkinsville |
KY |
30 |
$4,000,000 |
Transit |
0 |
| Newtown Pike Extension (Road and Bridge Construction - Phase 4) |
Lexington |
KY |
150 |
$9,100,000 |
Streets/Roads |
59 |
| Streetscape Improvements Limestone Ave |
Lexington |
KY |
75 |
$8,500,000 |
Streets/Roads |
-68 |
| Newtown Pike Extension (Phase 4 Right-of-way acquisition) |
Lexington |
KY |
10 |
$6,200,000 |
Streets/Roads |
15 |
| Streetscape Improvements - Vine Street |
Lexington |
KY |
75 |
$5,200,000 |
Streets/Roads |
-25 |
| Streetscape Improvements - Main Street |
Lexington |
KY |
75 |
$4,500,000 |
Streets/Roads |
-23 |
| Polo Club Blvd Completion |
Lexington |
KY |
50 |
$3,400,000 |
Streets/Roads |
-23 |
| Newtown Pike Extension (Mitigation Funding) |
Lexington |
KY |
20 |
$3,000,000 |
Streets/Roads |
16 |
| Construction of Salt Barn on Athens-Boonesboro |
Lexington |
KY |
35 |
$2,500,000 |
Streets/Roads |
-39 |
| Streetscape Improvements - Cheapeside Park |
Lexington |
KY |
35 |
$2,000,000 |
Streets/Roads |
-3 |
| Mt Tabor Road Widening, Patchen Drive to Richmond Road |
Lexington |
KY |
30 |
$1,225,000 |
Streets/Roads |
83 |
| Newtown Pike Extension (Phase 4 Utilities) |
Lexington |
KY |
50 |
$1,100,000 |
Streets/Roads |
14 |
| Midland Avenue widening for the Bluegrass Aspendale Redevelopment |
Lexington |
KY |
20 |
$800,000 |
Streets/Roads |
-19 |
| Alumni Drive, Inbound, Extend Right Through Lane |
Lexington |
KY |
10 |
$400,000 |
Streets/Roads |
-5 |
| Waveland Museum Lane Reconstruction at Railroad Intersection |
Lexington |
KY |
10 |
$385,000 |
Streets/Roads |
-14 |
| Squires Road Sight Distance Improvements |
Lexington |
KY |
10 |
$290,000 |
Streets/Roads |
-6 |
| Pine Needles Right Turn Lane at Man O' War |
Lexington |
KY |
10 |
$275,000 |
Streets/Roads |
-17 |
| North Limestone Streetscape Enhancements north of 4th Street |
Lexington |
KY |
10 |
$250,000 |
Streets/Roads |
-11 |
| East Third Street Streetscape Enhancements |
Lexington |
KY |
15 |
$250,000 |
Streets/Roads |
-12 |
| Railroad Crossing Repairs at 6 locations |
Lexington |
KY |
10 |
$100,000 |
Streets/Roads |
44 |