WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.
Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…
Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.
Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…
OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.
$14,100,000.00 - 0 jobs - Streets/Roads Program
42% voted critical - 58% voted not critical - 187 votes cast
Edit the Wiki Description (editing policy)
Work consists of repainting the Southbound 14th Street Bridge over Potomac River and other repair works such as deck repairs, structural steel repairs and masonry repairs. Work on the Northbound 14th Bridge consists of the removal and replacement of the existing asphalt bridge deck wearing surface, pier masonry pointing, removal and disposal of existing paint and application of new paint for steel structures and replacement of windows in the operator house.
[edit] Points in Favor
[edit] Points Against